Software and Computing

Software and Computing Meeting

2014-10-08 12:00
2014-10-08 13:00
America/New York
Wednesday, 8 October 2014
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00SC&GL R&D update ( 00:20 ) 1 filePavol Federic (NPI-ASCR)
12:20Proposal for the MTD (stream) data production ( 00:20 ) 1 fileRongrong Ma (BNL)
12:40Review of event filtering capabilities in STAR ( 00:20 ) 2 filesJason Webb (BNL)
13:00AOB ( 00:10 ) 0 filesAll (All)

HFT soft effort steering meeting

2014-10-02 15:00
2014-10-02 17:00
America/New York
Thursday, 2 October 2014
1-189, at 19:00 (GMT), duration : 02:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________
 
TimeTalkPresenter
15:00simple barrel SSD : test of DcaXY ( 00:20 ) 1 filejonathan

STAR Polls

Welcome to STAR Drupal polls

We have had two polling interface

201410

Software and Computing Meeting

2014-09-24 12:00
2014-09-24 13:00
America/New York
Wednesday, 24 September 2014
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00SC&GL R&D update ( 00:20 ) 0 filesPavol Federic (NPI-ASCR)
12:20HFT calibratio status for Run 14 ( 00:20 ) 1 fileHao Qiu (LBNL)
12:40Run 14 Sti/Stv Geometry progress ( 00:20 ) 0 filesDmitri Smirnov (BNL)
13:00AOB ( 00:10 ) 1 fileAll (All)

Remote power cycling network switches in the WAH

This documents the Network Power Switch plugs used to remotely power cycle STAR's network switches in the Wide Angle Hall.

Run 12 UU h-/h+ initial test sample for new alignment

 I processed ~45k st_centralpro Run 12 UU193 events (using runs scattered over the UU operations duration) with and without the new TPC alignment, using the following two chains in SL14h:

HFT Software Meeting (Special on Sept. 22)

2014-09-22 17:00
America/New York
Monday, 22 September 2014
, at 21:00 (GMT), duration : 00:00

- Geometry issues and basic tracking QA (Jonathan/Bingchu/Xin/etc) + how to fix the baseline
- Tracking issues (Hao)
- Alignment (Mike/Alex/Long)+ how to consolidate PXL,IST,SSD
- Steps leading to production  (Xin)
       - Calibration status & checks to perform.
- Embedding strategy (Mustafa?)


====SeeVogh Reservation Information====

Title:          HFT Software Meeting
Description:
Community:      STAR
Password:       hft
 Meeting type: Open Meeting (Round Table)

 Meeting Access Information:
        SeeVoghRN Application       http://research.seevogh.com/joinSRN?meeting=MeMMMu2a2tD8Di999vDv9e
        WebStart (Java)             http://research.seevogh.com/join?meeting=MeMMMu2a2tD8Di999vDv9e
        Mobile App :  Meeting ID: 708 0597   or  Link: http://research.seevogh.com/join?meeting=MeMMMu2a2tD8Di999vDv9e

 - Phone Bridge
         ID: 708 0597
         Password: 6416

TimeTalkPresenter
16:00HFT status and overview ( 00:20 ) 1 fileFlemming Videbæk
16:20Steps towards Production ( 00:20 ) 1 fileXin
16:40update SSD geometry ( 00:20 ) 1 filejonathan
17:00PXL Alignment summary ( 00:20 ) 1 fileMichael Lomnitz
17:20Geometry QA ( 00:20 ) 0 filesXin/Bingchu

HFT soft effort steering meeting

2014-09-18 15:00
2014-09-18 17:00
America/New York
Thursday, 18 September 2014
BNL 1-165, at 19:00 (GMT), duration : 02:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________
TimeTalkPresenter
14:00SSD geometry update ( 00:20 ) 1 filejonathan
14:20simulation without inner detectors ( 00:20 ) 1 filejonathan

HFT soft effort steering meeting

2014-09-11 15:00
2014-09-11 16:00
America/New York
Thursday, 11 September 2014
BNL 1-165, at 19:00 (GMT), duration : 01:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________
TimeTalkPresenter
14:00tracking study ( 00:20 ) 1 fileHao

HFT soft effort steering meeting

2014-09-04 15:00
2014-09-04 16:00
America/New York
Thursday, 4 September 2014
, at 19:00 (GMT), duration : 01:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________

Topics to consider:

- Y2013 base QA and readiness (all)

- Overlap/illegal/averaged volumes followups

(possibly Jonathan, Jason, Xin, Victor)

- Further understanding of Sti's energy loss in
the simple beam pipe (Dmitri)

- Radial layers tolerances (Victor)

- Hung jobs? RT#2903 (Victor)



TimeTalkPresenter
14:00SSD geom : overlaps issues ( 00:20 ) 1 filejonathan
14:20SSD geom : overlaps in Sti ( 00:20 ) 1 filejonathan

HFT soft effort steering meeting

2014-08-28 15:00
2014-08-28 16:00
America/New York
Thursday, 28 August 2014
, at 19:00 (GMT), duration : 01:00
EVO Bridge ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112

________________________________________


Items to discuss:

[node:31233] & [node:802]

Effect of wrongly initialized TPC padrow T0s for Run 14

The "story" of the wrongly initialized TPC padrow T0s is documented in this TPC hypernews po

Quality Assurance

Speaker : Gene V. Buren ( BNL )


Talk time : 15:45, Duration : 00:15

 

Calibration progress

Speaker : Gene V. Buren ( BNL )


Talk time : 12:40, Duration : 00:20

Calibration activities and status updates since You do not have access to view this node highlighted in red...

Software and Computing Meeting

2014-08-20 12:00
2014-08-20 13:00
America/New York
Wednesday, 20 August 2014
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Sti/geometry progress ( 00:20 ) 0 filesDmitri Smirnov (BNL)
12:20Base QA and Timing with the HFT ( 00:20 ) 1 fileJason Webb (BNL)
12:40Calibration progress ( 00:20 ) 0 filesGene V. Buren (BNL)

Run 12 UU TPC Drift Velocity with new alignment

Feedback/discussion about this page followed on tje TPC hypernews here.

Online support issues

Speaker : Wayne Betts ( BNL )


Talk time : 16:20, Duration : 00:20

Run 12 UU TPC T0 with new alignment

 Using the new TPC alignment, Matt Posik & I observed a notable loss of west-side (positive z & η) primary tracks for use in other calibrations.

HFT soft effort steering meeting

2014-07-31 15:00
2014-07-31 16:00
America/New York
Thursday, 31 July 2014
TBC, at 19:00 (GMT), duration : 01:00
TimeTalkPresenter
03:20Energy Loss Test with Sti (July 23) ( 00:15 ) 0 filesXin Dong
03:35timing/cpu tests StiSst ( 00:20 ) 1 filejonathan
03:55plots of Eloss for different StiSst configs. ( 00:20 ) 1 filejonathan