STAR Protected
Update to CAVE geometry / DX magnets
02/04/2010 Update
Adding in the shielding to the east and west tunnels. I still need to add in material surrounding the beam pipes for the sh
web pages
- http://www.star.bnl.gov/~bouchet/TCFIT/eval_ver1.ppt.htm : evaluation TCFIT for single D0
.idl file for database creation - SvtSimulatorTune
/* SvtSimulatorTune.idl
AL for W+, W- from SL09g, Run 9, after Q/PT cut (take3)
This is another (3rd) spin sorting of pp500 Ws from Run 9, January 27, 2009
TPC Hit Errors (Run 9)
As was TPC Hit Errors (2008), hit errors were found for Run 9 by Victor Perevoztchikov.
TPC Track Finding Efficiency for W cross section
TPC Track Finding Efficiency for W cross section
Data Sample: Run 9 pp500 SL09g production of L2W
List of Particles defined in starsim and StarClassLibrary
gid= 1 [starsim: GAMMA] [scl: gamma] StGamma gid= 2 [starsim: POSITRON] [scl: e+] StElectron gid= 3 [starsim: ELECTR
2009 200 GeV SpinDb (Brian's files)
Attached below are the QA plots for all files located in
star/u/pagebs/spinDb/2009/bXingFromTrgData/out
EXCEPT:
BSMD Calibration Update for 1/27
A number of changes have been made since last week. In no particular order:
New Background Subtraction Method for the W and Systematic Uncertainties
Physics Backgrounds in the W Signal and QCD Background Shape
Topical discussion: Di-Hadron Correlations and ZYAM in HI
These pages are intended to discuss/collect material concerning the ZYAM approach ("Zero Yield At Minimum" + subtraction of elliptic flow mod
Comparing BTOW to BPRS in Run 10
At the request of Gerard and Oleg, I wrote some software to compare BTOW hits to BPRS hits from daq files.