STAR Protected
Selecting 2005 status table for simulation
Outlined here is the process of selecting the status table to apply for 2005 simulation data.
2009-11-03
3 November 2009
Very brief meeting, everyone still working on understanding geometry.
RHICBOS AL prediction for Transverse Mass
RHICBOS AL prediction for Transverse Mass
Time Dependency in BEMC Gains, Piecewise Linear Fit by Day
We are continuing to refine our characterizations of the time-dependence for BEMC gains.
Problems with applying TPC alignment
I ran a test (in SL09e) where I made the alignment of one sector grossly wrong.
Very Preliminary Run6 FPD AN with cuts
The following plots all show RAW cross ratio without polarization corrections.
Run6 FPD Fiducial cut
For all previous FPD analysis, fiducial volume cut of 0.5cell width has been used.
2009.11.02 Jason EEMC geometry: results with and without LOW_EM options
Monte-Carlo setup:
11 Nov
November 2009 posts
evaluation of TpcRS (new TPX slow simu)
A)----- Au+Au events @ sqrt(s)=200 GeV, no pileup simulation
Events samples were generated by Wei-Ming using: sqrt(s)=200 GeV, Relativistic Quantum Molecular Dynami
STAR Management Meeting
BNL, 50-Orange Room, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952
Time: 11 AM - 12 PM EDT
* --===================================================================--*
Agenda:
1) Run10 preparation and TOF problem(?) - Bill
2) FGT instalations - Flemming, Bernd
3) ISMD Proceedings - Nu
4) TBD
* --====================================================================--*
Brief Summary: 0) Attendency:
Notes:
1) STAR TPC Review (key= star2009), June 4,5, BNL. Ron Settler (chair). Review report.
2) NPE Committee, H. Huang (chair)
3) STAR TOF Close Out Review, Aug. 10-11. Review report and The Plan.
4) STAR FMS Review agenda, Sept. 1-2, BNL, P. Jacobs (chair). Review report
Future Meetings:
1) STAR-DoE HFT CD-1 review, postpond to Nov. 12-13, BNL.
The rehearsal is scheduled on Thursday and Friday, Oct. 29 and 30th.
2) STAR Analysis Meeting, Jan. 11-15, 2010, UT Austin
3) APS April meeting, Feb. 13-17, 2010, Washongton DC.
Correction for photon conversions in d+Au 2003 and p+p 2005 pi0 analysis
1. Photon conversions
Twist correction notes, pp2009 (FF)
Data for the FullField twist correction was provided by Gene over the weekend: