Home

The STAR experiment

  • Blogs
  • Events
  • Help&FAQ
  • Home
  • Polls
  • Popular
  • Sitemap
  • PWG
  • Software & Computing
  • Sub-systems
  • Council
  • General
  • Juniors

Software and Computing

  • You must register or login in order to post into this group.

Detector Sub-systems

  • BEMC
  • BTOF
  • DAQ
  • Detector Upgrades
  • EEMC
  • EPD
  • ETOF
  • FCS
  • FGT
  • FPD & FMS & FPS
  • FTPC
  • FTT
  • HFT
  • HLT
  • L3
  • MTD
  • MTD NPS Maps
  • PMD
  • PP2PP
  • RICH
  • Roman Pot Phase II*
  • Run-18 calibrations
  • SSD
  • SVT
  • Slow Controls
  • TPC
    • ALTRO Settings
    • FCF
    • Field Cage Shorts
    • GridLeak Studies
    • Long term life time and future of the STAR TPC
    • SpaceCharge studies
    • TPC Sector Alignment Using Particle Tracks for Run 8
    • TPC group meetings 2020-
    • TPC performance
      • TPC Hit Errors (2008)
      • TPC Hit Errors (Run 9)
      • TPC Pt and DCA resolution
    • TPC speed upgrade 2022
    • TPX high rate test
  • TRG
  • Trigger Detectors
  • VPD
  • test

User login

Navigation

  • Groups
  • Recent posts

Group notifications

This group offers an RSS feed. Or subscribe to these personalized, sitewide feeds:
  • All posts:
    • Feed
    • Page
Home » Groups » Software and Computing

TPC performance

Updated on Thu, 2016-03-24 10:05. Originally created by genevb on 2008-09-03 16:59.
  • unknown

 Documentation on performance of the TPC
 

  • Run 15 200 GeV p+Al Hit Errors
  • Run 15 200 GeV p+Au Hit Errors
  • Run 15 200 GeV p+p Hit Errors
  • Run 14 (200 GeV Au+Au) TPC Hit Errors
  • Run 14 (15 GeV Au+Au) TPC Hit Errors
  • Run 13 TPC Hit Errors (days 74-128) and Run 13 TPC Hit Errors (Days 129 -161) (pp510)
  • Run 12 Cu+Au TPC Hit Errors
  • TPC hiterrors Run12 U+U 193 GeV
  • Run 12 pp510 hit errors
  • Run 12 pp200 (before dE/dx calibration)
  • TPC Hit Errors (Run11 Au+Au 27 GeV)
  • Hit errors for Run11 Au+Au 200 GeV dataset
  • TPC Hit Errors (Run11p+p 500 GeV)
  • TPC Hit Errors (Run 9), both pp500 and pp200, and re-calibrated TPC hiterrors Run9 p+p 200 GeV RFF
  • TPC Hit Errors (2008) (pp200, not certain it was Run 8 or an earlier dataset)

 

  • TPC Pt and DCA resolution

 

  • TPC Hit Errors (2008)
  • TPC Hit Errors (Run 9)
  • TPC Pt and DCA resolution
‹ TPC group meetings 2020- up TPC Hit Errors (2008) ›
Groups:
  • Software and Computing
  • Printer-friendly version
  • Login or register to post comments
Privacy and Security notice webmaster