aliceb's blog - Run QA notes - June 3., 2009
- Revisiting Eta Library - June 2., 2009
- Luminosity Monitoring and Asymmetries from 500 GeV running - May 27., 2009
- Beam Direction from ZDC & BBC - May 4., 2009
- 28 April 2009 Meeting - April 28., 2009
- 200 GeV Long. Running Beam Direction - April 27., 2009
- Investigating Shower Shapes & Chi2 - April 20., 2009
- Analyzing ZDC Data after Spin Rotator Changes - April 7., 2009
- Scanning Isolation & Hadronic Veto - April 6., 2009
- Draft RSC Talk - March 26., 2009
- Day 76 ZDC analysis - March 17., 2009
- EEMC Tower and Mapmt Channel Prinouts - March 16., 2009
- Analyzing Day 74 ZDC data - March 16., 2009
- Analyzing Day 73 ZDC Runs - March 14., 2009
- BSMD and BPRS runs 10066028-40 - March 13., 2009
- Some slides on ZDC SMD - March 13., 2009
- Preliminary EEMC Timing Curves by Crate + Individual Channels - March 11., 2009
- ZDC Analysis: Data Taken March 7-8 - March 9., 2009
- BTOW timing runs 10065031-45 - March 8., 2009
- Analyzing runs 10066001-114 - March 7., 2009
- ZDC Pol Analysis: runs 10063009-10063016 - March 4., 2009
- BSMD and BPRS timing runs 10060041-54 - March 3., 2009
- Some BSMD spectra - March 2., 2009
- ZDC Pol analysis: runs 1060035-37 - March 2., 2009
- Testing Run 10049077 - February 25., 2009
|