mnaglis's blog - baseline for aligning Sector 20 - November 15., 2010
- calibration delivery timescale1 for Run11 - July 13., 2011
- checking tpcAnodeHVavg table entries in the DB - August 17., 2010
- comparison alignment parameters between FF and RFF for Run10 preliminary calibration - August 19., 2010
- comparison alignment parameters between FF and RFF for Run9 final calibration - September 2., 2010
- comparison of the phi meson spectra measured by STAR and PHENIX - September 7., 2010
- confirmation of Nihar's results on residuals for different particle species - March 11., 2011
- cuts in the hit errors calibration procedure - September 15., 2011
- Differences in the run9 embedding produced with DbV20100301 and DbV20110301 - December 1., 2010
- draft of the low luminocity fill request - February 10., 2011
- fixing "fixed" AV in the DB for Au+Au 11 GeV dataset - August 17., 2010
- Hit errors calibration HOWTO - June 27., 2012
- Hit errors for Run11 Au+Au 200 GeV dataset - October 9., 2011
- ideal simulation, check pt distribution for primary and global 0.5 GeV tracks - March 17., 2011
- looking at laser tracks in sector 2 - November 18., 2010
- looking at laser tracks in sector 20 - November 12., 2010
- low lumi run11? - March 11., 2011
- Mapping between TPC sector/socet and LeCroy powersupply card/channel - May 2., 2011
- Pulls before/after hit errors calibration - September 9., 2011
- reconstucted pt in simulation with ideal TPC alignment - March 11., 2011
- residuals in simulation - April 1., 2011
- residuals in simulation done with realistic alignment parameters - March 11., 2011
- residuals when all padrows are included, Run-10, FF - December 16., 2010
- revisiting alignment (macroses only, step 0) - February 3., 2011
- Run 12 T0 calibration - April 11., 2012
|