seelej's blog - Run6 Pi0 Analysis Update - For Alan - December 10., 2009
- APS DNP 2009 W Talk - October 8., 2009
- Spin PWG Presentation W Analysis (10/8/2009) - October 7., 2009
- Spin PWG Presentation W Analysis (10/01/2009) - October 1., 2009
- Spin PWG Presentation W Analysis (9/24/2009) - September 24., 2009
- Run9 W Presentation - September 15., 2009
- Run9 500 GeV BTOW Relative Gains - September 14., 2009
- 2009 Walgo data results - September 3., 2009
- Test Blog - August 5., 2009
- Progress on GEM Scanning - July 17., 2009
- PWGC Presentation on fast-track L2W Production - June 29., 2009
- Production preparation 2 - June 25., 2009
- pp500 QCD simulation request - June 23., 2009
- Introduction to Spacecharge in the TPC - June 15., 2009
- run9 500 GeV BTOW relative gains calibration - June 10., 2009
- TPC Review Talk on spacecharge in pp500 - June 2., 2009
- RHIC/AGS User's Meeting W Talk - May 27., 2009
- APS April Meeting Hadron A_LL talk - April 27., 2009
- APS April Meeting W Talk - April 27., 2009
- zdc rates vs runnumber in run9 - April 7., 2009
- Towards run9 Production and Analysis - April 2., 2009
- Correlations in BSMD Saturation in run9 - March 30., 2009
- Are the BTOW and BSMD data from the same event in run9? - March 30., 2009
- Run9 BTOW HV Mapping Analysis - Summary - March 10., 2009
- Run9 BTOW HV Mapping Analysis - Part 2 - March 8., 2009
|