- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Upsilon 400 series
Updated on Mon, 2008-09-15 01:22. Originally created by rjreed on 2008-09-12 17:36.I have switched to running over the upsilon 400 series for this analysis until the new embeded set is available.
pixel geometry - code changes
Updated on Wed, 2009-10-14 16:21. Originally created by bouchet on 2008-09-11 21:29.chain working in starnew (SL08d):
BFC:WARN - StBFChain::Setup
QA :INFO - ==============================================
PPV Revision 1.29 +low pt- high luminosity fmsslow trigger evaluation
Updated on Wed, 2008-09-17 21:53. Originally created by rjreed on 2008-09-11 14:58.daq files are at:
/star/data03/daq/2008/068/9068124f
MuDst files are at:
/star/data05/scratch/rjreed/PPV2008Eval/MuDstPt100fmshigh
Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L2 Trigger 2
Updated on Thu, 2008-09-11 00:00. Originally created by rjreed on 2008-09-11 00:00.From:
Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L0 Trigger
Updated on Wed, 2008-09-10 16:00. Originally created by rjreed on 2008-09-10 16:00.Ignoring the problems with the acceptance efficiency, I can still calculate trigger efficiencies. The L0 trigger requirement is: a 3 tower cluster > 4 GeV. In my code, I use the L2 s
Data Jet Distributions in Eta and Pt with Vertex Cut ( |vz| < 60 cm) for Fill 7847
Updated on Wed, 2008-09-10 12:24. Originally created by cjones on 2008-09-10 12:24.Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Acceptance 2
Updated on Wed, 2008-09-10 15:02. Originally created by rjreed on 2008-09-09 23:07.Geometric acceptance was originally found to be much higher, ~0.5
EMC calib accuracy for W program
Updated on Fri, 2008-09-26 14:03. Originally created by balewski on 2008-09-09 14:47.My thoughts about necessary calibration accuracy for a successful W program at STAR
BTOW calib 2008 w/ pi0 (by Alan)
Updated on Tue, 2008-10-14 13:35. Originally created by balewski on 2008-09-08 11:54.
INPUT:
- Run=9047029
- ideal gains
- db status tables, peds
- trigID=220520 = bht2-mb
Pio selection cuts:
Study of ET Correction Factor Gaussian Fit
Updated on Fri, 2008-09-26 17:37. Originally created by pagebs on 2008-09-08 02:17.ET Correction Factor Study using Gaussian Fits