Sort by:[Date]

Step One Status Update

We have been able to map out and run most of the frist step(smd slope fitting) of the EEMC calibration. In this step we have identified three sub steps:

TCFIT for strangeness

slide : here

HQ'10 - Fifth draft

Grouped Run Data/Charts for EEMC Calibration

Update: I created graphs for comparing the 6th group to the 3rd group and the 3rd group to the 1st group.  I also corrected the titles on the first graphs.  Most of the l

Fast EM shower simulation

HQ'10 - next draft

Three Slides

Creating the Mask File

Update: June-17-2010

Asymmetries

Initial look at cosmic ray resolutions

This is the result of work I am doing with Amal Sarkar.

Steps: