Summary of Lead Problems

Original hint something strange was going on in the new vs.

x0/y0 into the Geometry/pp2pp database

Hi,

I've written our x0,y0 offset (13 sets) --- each set contains a row of 32 numbers --- into the database of Geometry/pp2pp of StarDb in the table of "pp2ppOffset".

"One set of pedestal in StarDb, written & read & used" (An email sent on Oct. 15, 2009)

Oct 15, 2009

Further tests with lead

I threw photons over the entire endcap in the pt range 6-10 GeV.  Plots below are of reconstructed tower energy in the entire endcap divided by the input energy.

CD1 - Corrections to W Section and Figure

11/4 Group Meeting Update

1.

Selecting 2005 status table for simulation

Outlined here is the process of selecting the status table to apply for 2005 simulation data.

 

RHICBOS AL prediction for Transverse Mass

RHICBOS AL prediction for Transverse Mass

Time Dependency in BEMC Gains, Piecewise Linear Fit by Day

We are continuing to refine our characterizations of the time-dependence for BEMC gains.

Problems with applying TPC alignment

I ran a test (in SL09e) where I made the alignment of one sector grossly wrong.