Sort by:[Date]

Combined QM09 Abstract

Here is the combined QM09 Abstract for Shingo and myself.

Comments and suggestions are welcome.

W-Algorithm Development

This page outlines the development of the W-Algorithm for the run9 500 GeV data taking.

Last updated on 12/08/2008

Version - v1

q-statistics vs EMCICs

The goal of this study is to confront results from EMCIC fit and Tsallis distribution to spectra obtained from event generator where we know all parameters like total multiplicity, energy, temperat

Efficiency of PixelDetector using patches

This is a study of the Efficiency of Pixel Detector in the tracking of D0s using detector patches, based on the original work by H.Weiman

qm 2009

pdf and txt versions.

version 2 in pdf.

version 3 in txt and pdf.

version 4 in pdf.

2005 pT Shifts Update

 

2009 Geant geometry

The most recent GEANT geometry (y2008) does NOT contain this  fixture holding beam pipe and FTPCs. 

BNL Shifters for Run9

This blog entry concerns BNL users only.

SPIN PWG Meeting, Dec 4, 2008

Spin PWG Meeting, Dec 4 2008

upgr15 test production

11/30 :

I made a test sample of Au+Au Hijing events with upgr 15 with :