- My blog
- Post new blog entry
- Top bloggers
- Recent posts
STAR Scheduler Configuration
Updated on Sun, 2008-02-10 21:31. Originally created by kocolosk on 2008-02-10 19:38.I deployed a private build of SUMS (roughly 1.8.10) on CMSAF and made the following changes to globalConfig.xml to get local job submission working:
In the Queue List
In the Policy List
Now for the Dispatcher
And finally, here's the site configuration block
di-jets from pp 2008 collisions
Updated on Fri, 2008-02-08 17:56. Originally created by balewski on 2008-02-08 17:54.More details from L2-jet algo in PDF
Initial Setup
Updated on Sun, 2008-02-10 20:22. Originally created by kocolosk on 2008-02-06 16:45.First things first. I went to http://www2.lns.mit.edu/compserv/cms-acctappl.html and applied for a local account. The welcome message contained a link to the CMSAF User Guide found on this TWiki page.
AFS isn’t available on CMSAF, so I started a local tree at /osg/app/star/afs_rhic and began to copy over stuff. Here’s a list of what I copied so far (nodes are running SL 4.4):
CERNLIB
/afs/rhic.bnl.gov/asis/sl4/slc4_ia32_gcc345/cern
OPTSTAR
/afs/rhic.bnl.gov/i386_sl4/opt/star/sl44_gcc346
GROUP_DIR
/afs/rhic.bnl.gov/star/group
ROOT 5.12.00
/afs/rhic.bnl.gov/star/ROOT/5.12.00/root
/afs/rhic.bnl.gov/star/ROOT/5.12.00/.sl44_gcc346
SL07e (sl44_gcc346 only)
/afs/rhic.bnl.gov/star/packages/SL07e
I copied these precompiled libraries over instead of building them myself because of a tricky problem with the interactive nodes’ configuration. The main gateway node is a 64-bit machine, so regular attempts at compilation produce 64-bit libraries that we can’t use. CMSAF has a node reserved for 32-bit builds, but it’s running SL 3.0.5. We’re still working on a proper resolution of that problem. Perhaps we can force cons to do 32-bit compilations.
The environment scripts are working, although I had to add more hacks than I thought were necessary. I only changed the following files:
- ~/.login
- ~/.cshrc
- $GROUP_DIR/site_post_setup.csh
It doesn’t seem possible to change the default login shell (chsh and ypchsh both fail), so when you login you need to type “tcsh” to get a working STAR environment (after copying my .login and .cshrc to your home directory, of course).
Basic interactive tests look good, and I’ve got a SUMS configuration that will do local job submissions to the Condor system (that’s a topic for another post). DB calls use the MIT database mirror. I think that’s all for now.
CMS Analysis Facility
Updated on Sun, 2008-02-10 19:54. Originally created by kocolosk on 2008-02-06 16:09.MIT’s CMS Analysis Facility is a large Tier-2 computing center built for CMS user analyses. We’re looking into the viability of using it for STAR computing.
First Clustering Plots
Updated on Wed, 2008-02-06 17:59. Originally created by wleight on 2008-02-05 15:15.Here are the plots from 5000 gamma events, with a seed tower energy cutoff of 1 GeV and a cluster energy cutoff of 4 GeV. The first page has on the upper left total cluster energy, on the upper
Photon QA Efficiency Plots With Error Bars
Updated on Wed, 2008-02-06 14:18. Originally created by wleight on 2008-02-04 12:17.See the below pdf. This was made from 5000 piminus events. The error bars were calculated from the formula delta-eff=sqrt(B*C/(B+C)^3), where B is the number of accepted tracks and C the n
More QA Plots, This Time With Efficiencies
Updated on Fri, 2008-02-01 11:57. Originally created by wleight on 2008-02-01 11:50.See the pdfs below. The second page has reconstruction efficiencies. Note that a cut of pt>5 GeV was imposed on the reconstructed tracks to try to reduce the impact of secondary particl
More on MC
Updated on Wed, 2008-01-30 13:49. Originally created by rcorliss on 2008-01-30 12:59.We've generated the following MC datasets, all located in /star/institutions/mit/corliss/magic_single_particle/
Further QA Plots
Updated on Mon, 2008-01-28 21:04. Originally created by wleight on 2008-01-28 21:00.See the pdfs attached below, each covering 1000 events of the given particle type in the given detector. Page 1 has the standard MC QA plots, page 2 has plots for MC primary tracks only, page 3
FGT HN Upload Summary Table
Updated on Tue, 2008-01-29 08:59. Originally created by kocolosk on 2008-01-28 13:24.balewski.2. Miro-apv_brd_pcb.pdf [PDF, 176.16 KB] May 15 2009 18:15:13.
balewski.3. 2008-10-FGT-DNPv1.pdf [PDF, 5.25 MB] May 15 2009 18:14:40.
gvisser.1. Slides from Miro, for FGT phone meeting, friday 2/8/2008 [PDF, 349.33 KB] May 15 2009 18:08:17.
gvisser.2. FGT & SSD electrical services materials budget - PRELIMINARY [VND.MS-EXCEL, 21 KB] May 15 2009 18:04:45.
gvisser.3. First quote for aluminum-based cable for ALL FGT SERVICES - MAX 7.24mm OD - technical details may be changed still [PDF, 36.83 KB] May 15 2009 18:07:39.
gvisser.4. [from Doug] Draka # HTC-50-1-1, 5kVdc cable (CERN spec) [PDF, 79.46 KB] May 15 2009 18:11:46.
miro.1. M_brd Quote Proto.pdf [PDF, 32.24 KB] May 15 2009 18:08:05.
miro.2. apv_board_doc.pdf [PDF, 67.31 KB] May 15 2009 18:22:36.
miro.3. apv_board_pcb.pdf [PDF, 112.81 KB] May 15 2009 18:17:32.
miro.4. sig_board_doc.pdf [PDF, 49.27 KB] May 15 2009 18:22:38.
miro.5. sig_board_pcb.pdf [PDF, 53.45 KB] May 15 2009 18:06:49.
miro.6. mechtest_pcb.pdf [PDF, 38.23 KB] May 15 2009 18:07:01.
miro.7. mechtest_doc.pdf [PDF, 86.36 KB] May 15 2009 18:03:40.
miro.8. mechtest_quote.pdf [PDF, 62.77 KB] May 15 2009 18:03:29.
miro.9. mechtrim_pcb.pdf [PDF, 107.18 KB] May 15 2009 18:11:34.
miro.10. pwr_board_pcb.pdf [PDF, 34.17 KB] May 15 2009 18:06:57.
pagebs.1. VertexPosition_mit0001_33_4000evts.jpg [JPEG, 43.64 KB] May 15 2009 18:06:30.
pagebs.2. OPcountsQCD.png [PNG, 13.65 KB] May 15 2009 18:15:29.
pagebs.3. OPcountsW.png [PNG, 17.83 KB] May 15 2009 18:04:16.
pagebs.4. ETspectrumQCD.png [PNG, 16.2 KB] May 15 2009 18:08:59.
pagebs.5. ETspectrumW.png [PNG, 17.87 KB] May 15 2009 18:15:36.
pagebs.6. IsoET01.png [PNG, 13.64 KB] May 15 2009 18:12:55.
pagebs.7. IsoET07.png [PNG, 13.88 KB] May 15 2009 18:14:05.
pagebs.8. TrigEToverIsoET01.png [PNG, 16.89 KB] May 15 2009 18:05:31.
pagebs.9. TrigEToverIsoET07.png [PNG, 17.61 KB] May 15 2009 18:10:40.
pagebs.10. TrigOverIso01.png [PNG, 16.4 KB] May 15 2009 18:07:03.
pagebs.11. TrigOverIso026.png [PNG, 15.03 KB] May 15 2009 18:21:17.
pagebs.12. TrigOverIso07.png [PNG, 16.88 KB] May 15 2009 18:21:22.
pagebs.13. geantAccessSample.txt [PLAIN, 916 bytes] May 15 2009 18:07:02.
pagebs.14. setC3detectedSpectra.png [PNG, 12.8 KB] May 15 2009 18:04:35.
pagebs.15. setC3thrownSpectra.png [PNG, 13.45 KB] May 15 2009 18:21:19.
pagebs.16. Abstract10-08V1.0.pdf [PDF, 18.53 KB] May 15 2009 18:04:45.
pagebs.17. v4.0_FinalSpectra.png [PNG, 13.65 KB] May 15 2009 18:17:35.
pagebs.18. Abstract10-08V1.3.pdf [PDF, 19.61 KB] May 15 2009 18:04:19.
wwjacobs.1. eemc_trigger_patches_annotated.pdf [PDF, 988.89 KB] May 15 2009 18:04:16.
wwjacobs.2. BPMT_BPRS 003.jpg [JPEG, 1.04 MB] May 15 2009 18:06:51.
wwjacobs.3. eemc_swingarm.pdf [PDF, 61.82 KB] May 15 2009 18:03:46.
wzhang.1. Sunset.jpg [JPEG, 69.52 KB] May 15 2009 18:04:49.
wzhang.2. disk123.gif [GIF, 19.86 KB] June 08 2009 14:04:09.
wzhang.3. backFgtHit.gif [GIF, 30.89 KB] June 08 2009 14:06:15.
- « first
- ‹ previous
- 1
- 2
- 3