Sort by:[Date]

Run 17 510 GeV p+p Hit Errors (v3)

DAQ file used: st_physics_18072023_raw_3500045.daq

Run 17 510 GeV p+p Hit Errors (v2)

DAQ file used: st_physics_18069023_raw_4500027.daq

TMVA

 

Gated Grid Driver/ Controller (GGDII)

 
New Gated Grid Driver System (GGDII) "Triode Mode Amplifier"

Inner TPC Electronics Upgrade

 

Test dN/dx fit with gradient

 I have tested Biao Tu approach with dN/dx fit using calculated gradient.
This approach does significant reduction of tails in dN/dx fit by Minuit.

dE/dx calibration for Run XVII AuAu54 has completed.

  The Run XVII AuAu54 dE/dx calibration pass has completed.  The calibration constants are loaded in MySQL.

EPD LV Power supply chassis wiring

 EPD LV PSU installed
PSU WIRING:

EPD LV Power BOM and Summary

 EPD Low Voltage Power Supply Assembly

D_TT paper draft for run12_pp200trans