Sort by:[Date]

Embedding Efficiency Problem Update

 

Run 16 Day 120 Calibration part 2

 This is a followup from the previous page, showing an additional 3 days of work on calibration.

SpinQA Error / bX QA Update

 This presentation details an error I believe to have occured in the spin QA as well as list several bunch crossing QA results

INPC 2016

 

Run 12 pp200 Tower Calibration QA

 

The analysis update for pi, K, p pT spectra with HFT in AuAu 200GeV.

The analysis update for pi, K, p pT spectra with HFT in AuAu 200GeV.

Sti comparison between SL16b for focus group mods

Several modifications for Sti are being proposed by a focus group. Dmitri S. helped assemble StRoot/Sti in SL16b to include modifications 1-5 from You do not have access to view this node.

HF-PWG minutes 2016/05/05

 1) Shenghui showed the initial results of NPE using Run14 AuAu 200 GeV data. 

pp200 GeV sample for single HFT hit and Vertex FInder studies

Sample rcf16002

  • Pythia 8.1.62
  • 200 GeV pp
  • ckin3 = 0.6 GeV
  • Signal 1: K0 short production

Systematic Uncertainty 20160505