Sort by:[Date]

PicoDst QA Run16065027 (test)

 

C-A time meeting (run 16)

Presentations for the Tuesday's time meetings (1:30 pm, Snyder Bld 911)
http://www.c-ad.bnl.gov/esfd/Scheduling_Physicist/Time_meetings/tm_listFY16.htm

PXL material budget

In view of the recent discussion on differences between y2014 and y2015, and the recent posts by Jason. I was puzzled by the difference plot

Topology Separated Results

Comparison of y2014a Material Budget to y2015a

Figure 1 -- Material sum in front of TPC inner field cage (30 degree slice in phi)

Prepare for dump times

Comparison PHENIX/STAR for request to ready for dump
- all Run 16 fills
- some fills don't have PHENIX status
- long delays for the dump are end-of-store studies

Run 13 W Test analysis : Study on Track duplicates , Track Splitting in tracking algorithm used for W analysis

 Study on Track duplicates , Track Splitting in STI , STICA from W analysis
»

AuAu 62.4 Photon rate estimates

HF-PWG minutes 2016/04/21

1) QA of Run15 pp200: a first look at the D0 signal in HT triggered events in pp collisions at 200 GeV from Run15. Several checks/comments were proposed at the meeting for the PA:

About Clustering algorithm

 The attached file contains a first attempt at wording  for a paper on reconstruction.