- General information
- Data readiness
- Grid and Cloud
- Infrastructure
- Machine Learning
- Offline Software
- Embedding
- Finding existing embedding data
- Operations (OBSOLETE)
- Submit a new embedding request
- Weekly embedding meeting (Tuesday 9am BNL time)
- Work Planned (OBSOLETE)
- Embedding Procedures
- QA Status (OBSOLETE)
- Reconstruction
- Simulation
- Embedding
- Production
- Test tree
Previous results - May 2002
Updated on Tue, 2007-02-27 13:30. Originally created by starembed on 2006-12-26 17:46.
Under:
This document is intended to provide all the information available for previous productions such that results for Quality Control studies and Productions Cross checks. Part of quality control studies include identification of missing/dead detector areas, distance of closest approach distributions (dca), and fit points distributions(Nfit). As part of production cross checks, some results in centrality dependance and efficiency are shown
This document is intended to provide all the information available for previous productions such that results for Quality Control studies and Productions Cross checks. Part of quality control studies include identification of missing/dead detector areas, distance of closest approach distributions (dca), and fit points distributions(Nfit). As part of production cross checks, some results in centrality dependance and efficiency are shown
»
- Printer-friendly version
- Login or register to post comments