CPU and bulk storage purchase 2009

The assumed CPU profile will be:

  • 2 GB of memory per core
  • Nearly 6 TB of disk space per node
  • Several CPU model will be investigated for best price/performance ratio (bulk purchase pricing matters in this purchase hence coordination between STAR/Phenix is likely needed) - currentely being considered are
    • Xeon 5550 @ 3350 SI2k (scenario A)
    • Xeon 5560 @ 3526 SI2k (scenario B)

The share between space and CPU is as below within the following caveats:

  • THe additional massive amount of storage (+170 TB for production) requires a secondary Titan head and the proper network switches. The total cost is projected to be ~  50k$ and we agreed to leave a ~ 20k$ unspent fund to move in this direction (cost shared with facility budget)

 

Experiment Parameters

Scenario A

Scenario B

Central Disk (TB) - Institution

20.00

20.00

Type Institution (Index from C&C)

11

11

Cost of Central Disk for Institution

$62,441.47

$62,441.47

Central Disk (TB) - NexSan-Production

0.00

0.00

Type NS-Prod (Index from C&C)

13

13

Cost of NexSan-Production

$0.00

$0.00

Central Disk (TB) - Production

170.00

170.00

Type of Production (Index from C&C)

12

12

Cost of Production Disk

$136,374.27

$136,374.27

Total Size of new Central Disk (TB)

190.00

190.00

Total Cost of Central Disk

$198,815.74

$198,815.74

Cost of Servers to support Central Disk

 

 

 

 

 

Compensation Disk entitled (TB)

0.00

0.00

Amount (up to entitlement) (TB)

0.00

0.00

Cost of Compensation Disk

$0

$0

Remaining Funds

$0

$0

 

 

 

Compensation count (1U, 4 GB below)

0

0

Compensation count (1U, 8 GB below)

0

0

CPU Cost

$0

$0

Distributed Disk

0.0

0.0

kSI2k

0.0

0.0

 

 

 

CPU Type (Index from Constants&Costs)

2

5

# 2U, 55xx, 5700 GB disk, 24 GB

74

72

CPU Alternative (not used)

0

0

CPU Cost

$429,126

$427,680

Distrib. Disk on new machines (TB)

421.8

410.4

kSI2k new

1983.2

2031.0

Total Disk (TB)

1393.8

1382.4

Total CPU (kSI2000)

4303.2

4351.0

Total Cost

$627,942

$626,496

Outside Funds Available

$62,441

$62,441

Funds Available

$588,000

$588,000

Unspent Funds

$22,500