FMS Analysis/Calibration
FMS Analysis/Calibration Meeting
- Tuesday 4:00 PM EST / EDT
- See zoom info in comments below
- Previous meetings (until Feb. 15, 2018):
drupal.star.bnl.gov/STAR/content/fms-calibration-taskforce - Analysis Status (last update: Apr. 4, 2018)
Dataset \ Item | FMS Calib (pi0) |
FMS QA (BS) |
FPS Calib | FPost Calib | FMS-FPS alignment |
FMS-FPost alignment |
|
RUN11pp | x | v | N/A | N/A | N/A | N/A | |
RUN15pptrans | v | v | v | v | |||
RUN15pplong2 | x | x | |||||
RUN15pAu | Δ | v | |||||
RUN15pAl | x | v | |||||
RUN17pp | Δ | x | Δ | Δ | x | x |
- Run 17 Run QA and Run list for FPS and FPOST
- FMS Run 17 runlist, bitshift, and hot/dead/maps
- FMS Run 17 bitshift summary https://drupal.star.bnl.
gov/STAR/system/files/ summaryBS_2.html - FMS Run 17 runlist and hot/dead/bad channel maps https://drupal.star.bnl.
gov/STAR/system/files/ finalMapsSummary_0.html
- FMS Run 17 bitshift summary https://drupal.star.bnl.
- FMS Run 17 Trigger Summary
- FMS Run 17 Log book drupal.star.bnl.gov/STAR/system/files/FMS%202017.pdf
Weekly Meeting (June 14, 2018)
- Chong: zgg study update
- Minghui: QCD background detail check
Weekly Meeting (May 29, 2018)
-David: SiPM Study Update (Paper I reference is also attached see granados_raul.pdf)
-ZZW:new A_UT
Weekly Meeting (May 08, 2018)
- Chong: QA update/first iteration for calibration
-Zhanwen: following last week
https://www.star.bnl.gov/protected/spin/zwzhu/
Weekly Meeting (May 01, 2018)
David:
-Possible new software for FMS
Minghui:
-Simulation Update
AJ:
-MIP Analysis update (refer to Jan 29 for zip file of ADC spectra)
Zhanwen:
Weekly Meeting (April 10, 2018)
- Minghui: update QCD with a little more statistics.
- AJ: very rough analysis note attached; will update plots, expand, and type up in LaTex
- ZZ: new result
Weekly Meeting (April 3, 2018)
- Minghui: update with more QCD simulation statistics.
- Chong: pi0 mass distribution update
* further update in Apr. 12
Weekly Meeting (Mar. 20)
- Chong: bad channels QA / fit update for pi0 calibration
- Minghui: DY pair reconstruction of Pythia simulation
- zhanwen : status report
Weekly Meeting (Feb. 27)
- Chong: bad channels QA (RUN15 pptrans day 80-81 and day 89-90)
- Prithwish
-David: Update on SiPM study
Weekly Meeting (Jan 29)
AJ: MIP Peak Update (FPS, FPost ADC Distributions attached as zip file)
David: Update on test bench of SiPMs
Weekly Meeting (Jan. 22)
- Chong: draft of collaboration meeting slide
- zhanwen : update for colla.
Weekly Meeting (Nov. 27, FMS analyzers)
- Chong: BS QA update (short remark of pAu QA)
- AJ: MIP peak update