FMS Analysis/Calibration

FMS Analysis/Calibration Meeting

  • Tuesday 4:00 PM EST / EDT
  • See zoom info in comments below
  • Previous meetings (until Feb. 15, 2018):
    drupal.star.bnl.gov/STAR/content/fms-calibration-taskforce
  • Analysis Status (last update: Apr. 4, 2018)
  • Dataset \ Item FMS Calib
    (pi0)
    FMS QA
    (BS)
    FPS Calib FPost Calib FMS-FPS
    alignment
    FMS-FPost
    alignment
    RUN11pp x v N/A N/A N/A N/A
    RUN15pptrans v v v v
    RUN15pplong2 x x    
    RUN15pAu Δ v    
    RUN15pAl x v    
    RUN17pp Δ x Δ Δ x x












Weekly Meeting (Nov 20)

 AJ: MIP Peak update
Minghui: e-/e+ pair mother problem

Weekly Meeting (Nov. 13)

David: -Status and Summary of SiPM study
Minghui: -Questions about the experimental data and Settings about the simulation
zhanwen:-SS Algorithm study

Weekly Meeting (Nov. 6, FMS analyzers)

- Chong: FMS BS QA update (2)
- Minghui: FMS point geometry match.

Weekly Meeting (Oct. 30, FMS analyzers)

- Zhanwen: simulation update / analysis meeting slides
- AJ: MIP peak update
- Minghui: simulation update/ fpost optimize

Weekly Meeting (Oct. 23, FMS analyzers)

 AJ: MIP peak update
David: My DNP slides

Weekly Meeting (Oct. 16, FMS analyzers)

- Chong: introduction/status of FMS BS QA study
- Minghui: optimize FPOST association to FMS point
- David : practice presentation for DNP 2017

Weekly Meeting (Oct. 2)

 

Weekly Meeting (Sep. 18)

- Chong: RUN15 FMS-FPS alignment update
- zhanwen: energy scale problem

Weekly Meeting (Sep. 11)

- Chong:RUN15 FMS-FPS alignment update

-David:SiPM IV analysis update
--Uploaded follow up slides after the meeting to reflect the comments I was given

FMS analysis 08/28/2017

2017-08-28 13:30
America/New York
Monday, 28 August 2017
2-78, at 17:30 (GMT), duration : 00:00
 
TimeTalkPresenter
13:30Simulation Update (Aug 28, 2017) ( 00:20 ) 1 fileM.H Zhao

Weekly meeting (Aug. 21)

- David Kapukchyan: Here is my update on the IV curves.  Attached is also the paper I am using for my study.
- Chong: update on FMS-FPS alignment

Weekly meeting (Aug. 7)

- Chong: RUN15 FMS-FPS alignment
  1. Get glbal shift in x or y direction
  2. Possible reasons of "Slope" vs. slat #

Weekly meeting (Jul. 31)

- David: FPS and FPOST good run list and IV curve status
  Status of the IV curve analysis and information about how good runs were chosen for the FPS and FPOST in Run 17.

Status (Chong)

- Progress for FMS-FPS correlation/alignment study
- FMS channel QA and study on point multiplicity

Weekly meeting (July 14)

- Meeting time: 9:30 - 11:00 (AM)
- Room/Online meeting ID will be added later

- Please prepare status overview (within 20 slides if possible)