HF PWG Meeting Minutes by Zhenyu - 2015/02/12
Updated on Thu, 2015-02-26 16:16. Originally created by yezhenyu on 2015-02-26 16:16.HF PWG Meeting Minutes by Zhenyu - 2015/01/15
Updated on Thu, 2015-02-26 15:31. Originally created by yezhenyu on 2015-02-26 15:31.1) J/psi in p
HF PWG Meeting Minutes by Zhenyu - 2015/02/26
Updated on Thu, 2015-02-26 15:06. Originally created by yezhenyu on 2015-02-26 15:06.QA of Preview Production
Updated on Thu, 2015-02-26 15:06. Originally created by dongx on 2015-02-26 14:54.Speaker : Xin Dong
Talk time : 15:20, Duration : 00:20
Sharing Hits in Sti
Updated on Thu, 2015-02-26 14:18. Originally created by smirnovd on 2015-02-26 13:52.IST hits = red line
PXL hits = black line
residual check with cosmic, space charge check, proposal about tuning HFT tracking parameters alone
Updated on Thu, 2015-02-26 13:36. Originally created by qiuh on 2015-02-26 13:36.Speaker : Hao Qiu
Talk time : 15:00, Duration : 00:20
Transverse spin asymmetries in CNI region
Updated on Thu, 2015-02-26 12:52. Originally created by svirida on 2015-02-26 12:52.Iteration2
Updated on Fri, 2015-02-27 13:13. Originally created by heppel on 2015-02-26 12:05.The following volages are to be used to create voltages for the next iteration (iteration3)
HFT soft effort steering meeting
Updated on Thu, 2015-02-26 11:50. Originally created by genevb on 2015-02-26 11:50. 2015-02-26 15:00
2015-02-26 16:00
America/New York
Thursday, 26 February 2015
1-189, at 20:00 (GMT), duration : 01:00
1-189, at 20:00 (GMT), duration : 01:00
- Phone Bridge
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
______________
Agenda:
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
______________
Agenda:
- Progress on running Sti with dropping HFT hits for non-3-HFT-hit tracks [Victor, Jason] {reference material: Jason's presentation at yesterday's S&C meeting}
- Progress on understanding what numbers to use for maximum tracks per HFT hit [Hao]
- BaseQA with max=1 (no hit re-use)? [Jason]
- BaseQA with higher occupancy? [Jason]
- Path forward for determination of HFT hits errors before production [Xin, Hao]
- If time allows: discussion of possible studies to better determine if non-3-HFT-hit tracks benefit at all from keeping HFT hits (following this hypernews thread)
- AOB
Time | Talk | Presenter |
---|---|---|
15:00 | residual check with cosmic, space charge check, proposal about tuning HFT tracking parameters alone ( 00:20 ) 1 file | Hao Qiu |
15:20 | QA of Preview Production ( 00:20 ) 2 files | Xin Dong |
Feb 26th Run 15 pp status
Updated on Thu, 2015-02-26 11:22. Originally created by gagliard on 2015-02-26 11:22.Feb 26 2015 HF PWG Update
Updated on Thu, 2015-02-26 01:10. Originally created by jaydunk on 2015-02-26 01:10.
jetMeetingSimUpdate 2/25/15
Updated on Wed, 2015-02-25 16:07. Originally created by klandry on 2015-02-25 14:59. found an error so this is wrong
OSU EPD Testbench, EPD meeting Feb25 2015
Updated on Wed, 2015-02-25 13:23. Originally created by iupsal on 2015-02-25 13:23.
IST timebin study
Updated on Wed, 2015-02-25 11:01. Originally created by huangbc on 2015-02-25 11:01.D0 reconstruction in Hijing simulations
Updated on Wed, 2015-02-25 10:34. Originally created by mlomnitz on 2015-02-25 10:32.GEANT4 study of IT/ET issue
Updated on Wed, 2015-02-25 10:31. Originally created by lukfulek on 2015-02-25 10:25.Reference
Speaker : Lukasz Fulek ( AGH-UST )
Talk time : 11:10, Duration : 00:10