AnalysisDay70
Updated on Thu, 2015-03-12 13:35. Originally created by heppel on 2015-03-12 10:15.The changes in trigger are reflected in data from run 16070009 and 16070010. These runs involve about 9 million triggers.
Run11 pp500 GeV Gamma Embedding
Updated on Wed, 2015-03-11 15:43. Originally created by zhoulong on 2015-03-11 15:43.1>data sample
At PDSF:
/eliza14/star/starprod/embedding/production2011_500GeV/Gamma_100_20144601
2>MiniMc introduction
OSU EPD Testbench, EPD meeting March11 2015
Updated on Wed, 2015-03-11 13:53. Originally created by iupsal on 2015-03-11 13:53.we have coupled SiPM to megatile, now we're looking at amplifying the signal
Run XIV AuAu200 dE/dx Calibration
Updated on Wed, 2015-03-11 13:42. Originally created by fisyak on 2015-03-11 13:41. dE/dx calibration has been done, put in MySQL, and checked with SL15d.
The resolutions (average over all data samples) are 7.15% for I70 and 7.05% for Ifit, respectively.
BES-II Figure
Updated on Wed, 2015-03-11 11:08. Originally created by psoren on 2015-03-11 11:08.Hi All,
Dijet Analysis - Update - Jet Meeting - Mar 11
Updated on Thu, 2015-03-12 17:27. Originally created by sra233 on 2015-03-11 11:05.AnalysisDay68(Monday)
Updated on Wed, 2015-03-11 12:14. Originally created by heppel on 2015-03-11 11:03. I have done an analysis of runs 16068021 16068022 16068023.
This is about 7 million events.
SINAP proposal to host pre-QM STAR Collaboration meeting in Shanghai
Updated on Wed, 2015-03-11 10:42. Originally created by xzb on 2015-03-11 10:42.run 13 trigger algo
Updated on Wed, 2015-03-11 10:15. Originally created by dolv719 on 2015-03-11 10:15.
RomanPots Alarms Quick Summary
Updated on Wed, 2015-03-11 09:52. Originally created by desilva on 2015-03-11 09:52.IST calibration for Run14
Updated on Wed, 2015-03-11 09:33. Originally created by ypwang on 2015-03-11 09:33.Run Progress
Updated on Wed, 2015-03-11 09:25. Originally created by videbaks on 2015-03-11 09:25.AOB
Updated on Wed, 2015-03-11 12:24 by testadmin. Originally created by jeromel on 2015-03-11 09:08.Speaker : All ( All )
Talk time : 12:55, Duration : 00:05
Incoming
- ESL minor update requested (active sub-system inconsistently treated)
ET run request
Updated on Wed, 2015-03-11 09:00. Originally created by wlodek on 2015-03-11 09:00.Calibration status for Run 14 production
Updated on Wed, 2015-03-11 12:15 by genevb. Originally created by jeromel on 2015-03-11 08:58.Speaker : Gene Van Buren ( BNL )
Talk time : 12:35, Duration : 00:20
Legend:
Not done
Proposed changes to the SSD code
Updated on Wed, 2015-03-11 10:16 by bouchet. Originally created by jeromel on 2015-03-11 08:56.Speaker : Jonathan Bouchet ( KSU )
Talk time : 12:15, Duration : 00:20
News from the front
Updated on Wed, 2015-03-11 09:56 by fazio. Originally created by jeromel on 2015-03-11 08:55.Speaker : Salvatore Fazio ( BNL )
Talk time : 12:00, Duration : 00:15