Lokesh QM2009 rehearsal talk: Bulk properties in Au+Au collisions at √sNN = 9.2 GeV in STAR experiment at RHIC
Updated on Tue, 2009-03-24 10:42 by lokesh. Originally created by jtakahas on 2009-03-05 07:40.Reference
Speaker : Lokesh Kumar
Talk time : 09:00, Duration : 00:45
Subhasis QM2009 poster: Photon multiplicity measurements at forward rapidityies in dAu collisions at root(s) = 200 GeV
Updated on Thu, 2009-03-05 07:39. Originally created by jtakahas on 2009-03-05 07:39.Reference
Speaker : Subhasis
Talk time : 17:45, Duration : 00:25
Yichun QM2009 rehearsal talk:Measurements of $K^{0}_{S}$ and $K^{\pm}$ production at high $p_{T}$ at STAR as a sensitive probe f
Updated on Wed, 2009-03-25 08:09 by xuyichun. Originally created by jtakahas on 2009-03-05 07:37.Reference
Speaker : Yichun
Talk time : 17:00, Duration : 00:45
Xianglei QM2009 rehearsal talk: Strange Hadron Production in d+Au Collisions at RHIC
Updated on Tue, 2009-03-24 14:25 by zhux. Originally created by jtakahas on 2009-03-05 07:31.Reference
Speaker : Xianglei
Talk time : 16:15, Duration : 00:45
Anthony QM2009 rehearsal talk: Strangeness production in heavy-ion collisions at STAR
Updated on Tue, 2009-03-24 13:54 by tone421. Originally created by jtakahas on 2009-03-05 07:30.Reference
Speaker : Anthony Timmins
Talk time : 15:30, Duration : 00:45
Spin Physics PWG meeting
Updated on Wed, 2009-03-04 21:14. Originally created by sichterm on 2009-03-04 21:14. 2009-03-05 12:00
2009-03-05 13:30
Etc/GMT-4
Thursday, 5 March 2009
phone 877-674-0006 1 077795# 1, at 17:00 (GMT), duration : 01:30
phone 877-674-0006 1 077795# 1, at 17:00 (GMT), duration : 01:30
Agenda may be found here
More
Updated on Wed, 2009-03-04 20:03. Originally created by matis on 2009-03-04 20:03.Talk time : 12:00, Duration : 00:20
BLM Installation
Updated on Wed, 2009-03-04 20:02. Originally created by matis on 2009-03-04 20:02.Speaker : Howard M.
Talk time : 11:40, Duration : 00:20
IST
Updated on Wed, 2009-03-04 20:01. Originally created by matis on 2009-03-04 20:01.Speaker : Gerrit
Talk time : 11:20, Duration : 00:20
Phase I Testing
Updated on Thu, 2009-03-05 12:49. Originally created by matis on 2009-03-04 20:00.Speaker : Michal
Talk time : 11:00, Duration : 00:20
Pixel Electrical
Updated on Wed, 2009-03-04 20:00. Originally created by matis on 2009-03-04 20:00.Speaker : Leo
Talk time : 10:40, Duration : 00:20
Pixel Numbering
Updated on Wed, 2009-03-04 20:51. Originally created by matis on 2009-03-04 19:59.Talk time : 10:20, Duration : 00:20
NEWS!!!!
Updated on Wed, 2009-03-04 19:36. Originally created by matis on 2009-03-04 19:36.Speaker : Hans Georg
Talk time : 10:00, Duration : 00:20
APV Readout System Long Cable Test Setup
Updated on Fri, 2009-04-24 16:41. Originally created by gvisser on 2009-03-04 18:41. Under:The APV front-end ASIC which forms the core of the Forward GEM Tracker readout system combines a sensitive preamplifier, switched-capacitor analog memory array, and low-voltage differential analog
The BBC beam background scalers saga
Updated on Wed, 2009-03-11 11:02. Originally created by genevb on 2009-03-04 18:40.While studying scalers for SpaceCharge calibration of Run 8 data last summer, I found that the BBC beam background scalers were clearly You do not have access to view this node (regarding which one
c) L2etowGammaAlgo (endcap gamma algorithm)
Updated on Fri, 2009-03-20 14:16. Originally created by balewski on 2009-03-04 17:55. Under:This algorithm searches for localized energy distributions in the endcap calorimeter, and will not run if the ETOW is not in the run.
b) L2btowGammaAlgo (barrel gamma algorithm)
Updated on Wed, 2009-03-04 14:55. Originally created by rcorliss on 2009-03-04 14:55. Under:This algorithm searches for localized energy distributions in the barrel calorimeter, and will not run if the BTOW is not in the run.
Opened simulation requests 20090304
Updated on Wed, 2009-03-04 14:53. Originally created by jeromel on 2009-03-04 14:50.
Table summary - simulations in priority order.
SSD weekly meeting 1-510-486-7333
Updated on Wed, 2009-03-04 11:14. Originally created by levine on 2009-03-04 11:14. 2009-04-01 11:00
2009-04-01 12:00
Etc/GMT-4
Wednesday, 1 April 2009
, at 15:00 (GMT), duration : 01:00
, at 15:00 (GMT), duration : 01:00
SSD weekly meeting 1-510-486-7333 NOTE US Daylight Saving Time
Updated on Mon, 2009-03-16 16:51. Originally created by levine on 2009-03-04 11:08. 2009-03-17 11:00
2009-03-17 12:00
Etc/GMT-4
Tuesday, 17 March 2009
, at 15:00 (GMT), duration : 01:00
, at 15:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
11:00 | News ( 00:10 ) 0 files | Howard Matis |
11:10 | Ladder board status ( 00:20 ) 0 files | Christophe Renard |
11:20 | RDO Board Status ( 00:10 ) 0 files | Micheal LeVine |
11:30 | Division of topics for review talk ( 00:10 ) 0 files | Christophe Renard, Micheal LeVine |
11:40 | Discussion of changes proposed as result of Eric's visit to Subatech -- End ring, alignment, cabling ( 00:20 ) 0 files | Howard Matis |
12:00 | Date/time for a small group meeting next week ( 00:10 ) 0 files | Howard Matis |
12:10 | AOB ( 00:10 ) 0 files |