RMP-Research Management Plan input

Speaker : All


Talk time : 14:05, Duration : 00:15

Next: Mini-productions

Speaker : All


Talk time : 13:50, Duration : 00:15

HFT Software

2009-02-20 13:30
2009-02-20 14:30
Etc/GMT-5
Friday, 20 February 2009
510-4867333, at 18:30 (GMT), duration : 01:00

Below it is:

Jan's How-to document in in our Document area:

http://drupal.star.bnl.gov/STAR/subsys/hft/documents/how-pages

 

 

TimeTalkPresenter
13:10Pre-production ( 00:20 ) 1 fileYifei
13:50Next: Mini-productions ( 00:15 ) 0 filesAll
14:00Library tests ( 00:05 ) 3 filesJonathan
14:05RMP-Research Management Plan input ( 00:15 ) 0 filesAll
14:20Efficiency and Material budget ( 00:05 ) 2 filesGerrit J. van Nieuwenhuizen II (MIT)

Grid Activities

2009-02-19 14:39
Etc/GMT-4
Thursday, 19 February 2009
Room 1-189 and phone bridge (see agenda below), at 19:39 (GMT), duration : 00:00

Usual meeting time and place (1 pm EST, phone info below)

Main items for discussion:

Any OSG news/meetings/announcements?
-- eg. Support for "compatibility" mode for GUMS grid-mapfile generation may be dropped

Sites' status (any admin or user reports welcome)

EC2 status update - lots of activity here it sounds like.

Plan for transition from stargrid01-04 to stargrid07-10 at BNL

AOB?


Phone / bridge information:
In the US, call 1-605-475-8500

Enter Conference Room Number : 5343115
Skype +99008275343115
 

Run 9 commissioning plan


Run 9 500 GeV Commission plan (start of draft)  Not necessarily time ordered
or prioritized

Establish collisions

TPC Phone Meeting

2009-02-26 15:40
2009-02-26 16:40
Etc/GMT-4
Thursday, 26 February 2009
Phone, at 20:40 (GMT), duration : 01:00

TPC Phone Meeting

2009-02-19 15:40
2009-02-19 16:40
Etc/GMT-4
Thursday, 19 February 2009
Phone, at 20:40 (GMT), duration : 01:00

Spin Physics PWG meeting

2009-02-19 12:00
2009-02-19 13:30
Etc/GMT-4
Thursday, 19 February 2009
phone 877-674-0006 1 077795# 1, at 17:00 (GMT), duration : 01:30

 The Agenda may be found here

 

More???


Talk time : 12:50, Duration : 00:20

BLM Installation

Speaker : Howard M.


Talk time : 12:30, Duration : 00:20

SSD Repair

Speaker : Howard M.


Talk time : 12:10, Duration : 00:20

IST

Speaker : Gerrit


Talk time : 11:50, Duration : 00:20

Phase I Testing

Speaker : Leo


Talk time : 11:30, Duration : 00:20

Pixel Mechanical

Speaker : Howard W.


Talk time : 11:10, Duration : 00:20

News

Speaker : Hans Georg


Talk time : 11:00, Duration : 00:10

06 Calculating 2009 HV from Electron Calibrations

Under:

The ideal gain for each tower satisfies the following relation, where E_T = 60 GeV when ADC is max scale (~4095 - ped):

05 Absolute Calibration from Electrons

Under:

We use the MIP ADC location calculated in part 03 to get a preliminary measure of the energy scale for each tower.

The following formula from SN436 provides the calibration coefficient:

ZDC ADC Spectrum

All data shown is from 2004 ZDC runs.

 

1. ADC Spectra for east & west calorimeters.

TCP parameters, Linux kernel

TCP stack and signal

TCP call stack

The following flow graph represents the TCP socket client/server answer/reply flow stack.

Accessing Trigger Data Files w/in StRoot

Abstract:  Quick turn around time for zdc polarimetry studies requires fast access to the data.  All of the necessary data for the BBCs, ZDC's and VPD's are (in principle) availa