Pixel Mechanical

Speaker : ??


Talk time : 11:10, Duration : 00:10

News

Speaker : Flemming/Hans Georg


Talk time : 11:00, Duration : 00:10

Test Entry

Test EntryUML generalizationUML generalization

AOB

Speaker : All ( All )


Talk time : 12:55, Duration : 00:05

Any other business.

Review of opened issues

Speaker : All


Talk time : 12:40, Duration : 00:15

We will review the list of opened ticket sent by Lidia

Embedding requests summary, review of te new schedule

Speaker : Particia Fachini ( BNL )


Talk time : 12:20, Duration : 00:20

BBC beam background scalers

Speaker : Gene Van Buren ( BNL )


Talk time : 12:00, Duration : 00:20

 Please see The BBC beam background scalers saga.

-Gene

Software and Computing phone meeting

2009-03-11 12:00
2009-03-11 13:00
Etc/GMT-5
Wednesday, 11 March 2009
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00BBC beam background scalers ( 00:20 ) 0 filesGene Van Buren (BNL)
12:20Embedding requests summary, review of te new schedule ( 00:20 ) 1 fileParticia Fachini (BNL)
12:40Review of opened issues ( 00:15 ) 0 filesAll
12:55AOB ( 00:05 ) 0 filesAll (All)

02 Comparing 2007, 2008 and 2009 BTOW Slopes

Under:

We have taken two sets of 1M pp events at sqrt(s)=500 GeV. For future reference, the statistical error on the slopes is typically in the range of 3.7%.  I give a plot of the

ZDC polarimetry in p+p 500 GeV runs (fills 10305, 10307, 10308, and 10325)

Each PDF file has the phi dependence fit on the last page.

The beam polarization is taken from the CDEV monitoring job as a ratio rhic_pol->avgAsymXS / rhic_pol->analyzingPowerS.

Run 9 BSMD Calibration

Under:

Parent page for BSMD Run 9 Calibration

Run 8 BPRS Calibration

Under:

Parent for Run 8 BPRS Calibration done mostly by Jan

Preliminary Cross Section Plot

 The proposed final version of the cross section plot would look like this.

 

Run 9 BPRS Calibration

Under:

Parent for Run 9 BPRS Calibration

Run 9 BTOW Calibration

Under:

Parent page for BTOW 2009 Calibrations

Run9 BTOW HV Mapping Analysis - Summary

This page outlines all the towers that have been swapped in the Run9 BTOW HV Mapping analysis (cellID->softID mapping).

PID v_2 and v_4 from Au+Au Collisions at 200GeV at RHIC

Correcting for Z-Vertex Variation in Two Particle Number Correlations

Speaker : Larry Tarini ( Wayne State )


Talk time : 10:00, Duration : 00:20

J/psi  production in minimum-bias d+Au collisions at sNN =200 GeV in STAR

Speaker : Chris Powell ( LBL )


Talk time : 17:00, Duration : 00:20

Rho0 vector meson production in CuCu collisions@200 & 62.4 GeV data at RHIC

Speaker : Prabhat Pujahari ( IITB )


Talk time : 16:40, Duration : 00:20