Integration: WSC design - Status / Plans

Speaker : Jim Kelsey ( MIT )


Talk time : 15:00, Duration : 00:45

Triple-GEM Part II: 2D readout test board preparation / testing

Speaker : Doug Hasell ( MIT )


Talk time : 14:40, Duration : 00:20

Triple-GEM Part II: Assembly / Handling / Lab preparation / QA

Speaker : Bernd Surrow ( MIT )


Talk time : 14:00, Duration : 00:40

LUNCH


Talk time : 12:30, Duration : 01:30

Triple-GEM Part I: Mechanics

Speaker : Jason Bessuille ( MIT )


Talk time : 12:05, Duration : 00:25

Triple-GEM Part I: Foil tests

Speaker : Joe Seele ( MIT )


Talk time : 11:45, Duration : 00:20

FEE: Dicing of APV chips

Speaker : Gerrit v. Nieuwenhuizen ( MIT )


Talk time : 11:30, Duration : 00:15

FEE: Design status and readiness

Speaker : Miro Plesko ( MIT )


Talk time : 10:30, Duration : 01:00

BREAK


Talk time : 10:15, Duration : 00:15

DAQ: Readout board design status

Speaker : Gerard Visser ( IUCF )


Talk time : 09:15, Duration : 01:00

ESMD box delay calibration curve

This is a plot of the ESMD MAPMT box delay time as a function of the box delay control register value 0-1023.

Abstract - Hadron Production ALL : CIPANP 2009

 Abstract - Hadron Production ALL : CIPANP 2009

 

STAR Spin Physics PWG meeting

2009-02-26 12:00
2009-02-26 13:30
Etc/GMT-4
Thursday, 26 February 2009
phone 877-674-0006 1 077795# 1, at 17:00 (GMT), duration : 01:30

Agenda may be found here

 

Welcome / Recent News

Speaker : Bernd Surrow ( MIT )


Talk time : 09:00, Duration : 00:15

STAR FGT Meeting

2009-02-27
2009-02-27
Etc/GMT-5
Friday, 27 February 2009
Orange Room - BNL Physics Department, at 05:00 (GMT), duration : 23:59

 


STAR FGT Meeting - February 27, 2009


A) EVO Access: http://evo.caltech.edu/evoGate/koala.jnlp?meeting=eueneevIveasatI8aBIu

        Title: STAR FGT Meeting

        Community: STAR

        Password: fgtin2010

B) EVO Phone Bridge: ID: 820842 / Password: 7652

        EVO Phone Bridge Telephone Numbers:

        Germany (DESY, Hamburg) +49 40 8998 1340

        USA (BNL, Upton, NY) +1 631 344 6100


 

TimeTalkPresenter
09:00Welcome / Recent News ( 00:15 ) 1 fileBernd Surrow (MIT)
09:15DAQ: Readout board design status ( 01:00 ) 2 filesGerard Visser (IUCF)
10:15BREAK ( 00:15 ) 0 files
10:30FEE: Design status and readiness ( 01:00 ) 1 fileMiro Plesko (MIT)
11:30FEE: Dicing of APV chips ( 00:15 ) 1 fileGerrit v. Nieuwenhuizen (MIT)
11:45Triple-GEM Part I: Foil tests ( 00:20 ) 1 fileJoe Seele (MIT)
12:05Triple-GEM Part I: Mechanics ( 00:25 ) 1 fileJason Bessuille (MIT)
12:30LUNCH ( 01:30 ) 0 files
14:00Triple-GEM Part II: Assembly / Handling / Lab preparation / QA ( 00:40 ) 0 filesBernd Surrow (MIT)
14:40Triple-GEM Part II: 2D readout test board preparation / testing ( 00:20 ) 0 filesDoug Hasell (MIT)
15:00Integration: WSC design - Status / Plans ( 00:45 ) 0 filesJim Kelsey (MIT)
15:45BREAK ( 00:15 ) 0 files
16:00DAQ: Crate Master board design status ( 00:20 ) 1 fileJohn Anderson (ANL)
16:20Infrastructure: Thermal model ( 00:10 ) 0 filesDoug Hasell (MIT)
16:30Infrastructure: Gas system / Slow-control ( 00:30 ) 0 filesALL
17:00AOB ( 00:30 ) 0 filesALL

HOW-TO: online databases, scripts and daemons

Under:

Online db enclave includes :

determination of the mean rms per ladder (for simulation)

 The primary idea was to create a default noise table used in simulation.

Actually, the plain simulation uses real noise values , which :

QA Plots Phi(Feb 2009)

Under:

QA P06ib (Phi->K +K)

 

07 BTOW absolute gains 'ab initio'

Under:

 Summary of intended BTOW HV change, February 24, 2009

Conclusion:

Access spin pattern from CDEV database

0. Usage and Example Output 


[onl04] ~/spin_pattern/> ./get_fill_pattern.pl --run=10054015

Polarization patterns:
+ = filled and positive