Update on the new online WebServer readiness

Speaker : Mike DePhillips ( BNL )


Talk time : 14:10, Duration : 00:10

Path for Ganglia online

Speaker : All ( All )


Talk time : 14:20, Duration : 00:10

Update on the Electronic ShiftLog

Speaker : Levente Hajdu ( BNL )


Talk time : 14:00, Duration : 00:10

Run VII preparation, meeting #13

Under:
-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
TimeTalkPresenter
14:00Update on the Electronic ShiftLog ( 00:10 ) 0 filesLevente Hajdu (BNL)
14:10Update on the new online WebServer readiness ( 00:10 ) 0 filesMike DePhillips (BNL)
14:20Path for Ganglia online ( 00:10 ) 0 filesAll (All)
14:30DAQ CVS in AFS ( 00:10 ) 0 filesJeffery Landgraf / Jerome Lauret (BNL / BNL)
14:40RealTime EventDisplay ( 00:10 ) 0 filesValeri Fine (BNL)
14:50AOB ( 00:10 ) 0 filesAll (All)

Production Management

Under:
1) Usually embedding jobs are run in "HPSS" mode so the files end up in HPSS (via FTP). To transfer them from HPSS to disk copy the perl script ~starofl/hjort/getEmbed.pl and modify as needed. This script does at least two things that are not possible with, e.g., a command line hsi command: it only gets the files needed (usually the .geant and .event files) and it changes the permissions after the transfers. Note that if you do the transfers shortly after running the jobs the files will probably still be on the HPSS disk cache and transfers will be much fast than getting the files from tapes.

Running Embedding

Under:
This page describes how to run embedding jobs once the daq files and tags files are in place (see other page about embedding production setup).

Basics:

Embedding code is located in production specific directories: ~starofl/embedding/P0xxx. The basic job submission template is typically called submit.starofl.pl in that directory.

Embedding Production Setup

Under:
This page describes how to set up embedding production. This procedure needs to be followed for any set of daq files/production version that requires embedding. Since this typically involves hacking the reconstruction chain, it is not advised that the typical STAR PA attempt this step. Please coordinate with a local embedding coordinator, and the overal Embedding coordinator (Olga).

Plot_Nfit.C

Under:
#ifndef __CINT__ #include "TROOT.h" #include "TSystem.h" #include #include "TH1.h" #include "TH2.h" #include "TH3.h" #include "TFile.h" #include "TTree.h" #include "TChain.h"

Plot_Dca.C

Under:
#ifndef __CINT__ #include "TROOT.h" #include "TSystem.h" #include #include "TH1.h" #include "TH2.h" #include "TH3.h" #include "TFile.h" #include "TTree.h" #include "TChain.h"

scan_embed.C

Under:
//v 1.7 2007/05/21 23:16:14 // owner: Cristina #ifndef __CINT__ #include "TROOT.h" #include "TSystem.h" #include #include "TH1.h" #include "TH2.h"

Plot_embed

Under:
<code>

//First run scan_embed.C to generate root file with all the histograms
// V. May 31 2007 - Cristina

#ifndef __CINT__

Run preparation Run VI (2006)

Under:
This page is meant to organize information about the calibration preparations and steps required for each subdetector for upcoming runs.

AOB

Speaker : All ( All )


Talk time : 15:00, Duration : 00:10

I would like to be able to talk briefly of

  • The need to test HPSS
  • The need for HPSS monitoring (cache online for Au+Au)
  • Trigger this year (filename, scheme, special run marking)

Offline QA update

Speaker : G. Van Buren ( BNL )


Talk time : 14:40, Duration : 00:10

Online QA update

Speaker : Paul Sorensen, Frank Laue ( BNL, BNL )


Talk time : 14:50, Duration : 00:10

Tomcat & Elog testing - remaining issues

Speaker : Levente Hajdu ( BNL )


Talk time : 14:30, Duration : 00:10

Shift signup (demo?) and functionalities

Speaker : Mike DePhillips ( BNL )


Talk time : 14:20, Duration : 00:10

Web server setup, readiness and next step

Speaker : Wayne Betts ( BNL )


Talk time : 14:10, Duration : 00:10

SSH Key management tool update (test and functionalities, additional requirements)

Speaker : W. Betts, J. Lauret ( BNL )


Talk time : 14:00, Duration : 00:10

Run VII preparation, meeting #12

Under:
-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
TimeTalkPresenter
14:00SSH Key management tool update (test and functionalities, additional requirements) ( 00:10 ) 0 filesW. Betts, J. Lauret (BNL)
14:10Web server setup, readiness and next step ( 00:10 ) 0 filesWayne Betts (BNL)
14:20Shift signup (demo?) and functionalities ( 00:10 ) 0 filesMike DePhillips (BNL)
14:30Tomcat & Elog testing - remaining issues ( 00:10 ) 0 filesLevente Hajdu (BNL)
14:40Offline QA update ( 00:10 ) 0 filesG. Van Buren (BNL)
14:50Online QA update ( 00:10 ) 1 filePaul Sorensen, Frank Laue (BNL, BNL)
15:00AOB ( 00:10 ) 0 filesAll (All)