Detector Readiness Checklist for Cosmics
prodution_pp200long2_2TOF+MTD+ETOW+BTOW+ESMD+BSMD+GMT+FPS+PP+IST+>>Feb. 27, 2018<<
Detector Readiness Checklist (Cosmic Data Taking, 2018)
1) Once Per Day
A) Reboot bdb.starp.bnl.gov (see section 3 in slow controls manual)B) Noise run for TOF/MTD pedAsPhys_tcd_only with TRG+DAQ+TOF+MTD (4M events, takes about 5-6 minutes)
C) EPD IV scan (can be in parallel with cosmics, mark run in elog)
2) Pedestals once per Shift
A) Take pedestal_tcd_only with TRG+DAQ+TPX+ITPC+ETOW+TOF+ETOF+MTD+GMT+FCS (1 event, run control will issue additional events automatically)B) Take pedestal_rhicclock_clean with TRG+DAQ (1k events)
3) Cosmic Data Taking
A) Check detector states for cosmic data takingB) Take CosmicLocalClock with TRG+DAQ+TPX+ITPC+ETOW+TOF+ETOF+MTD+GMT+L4 (30 minutes)
C) Laser runs every 4 hours (warm up in advance, 4k events)
Notes:
ETOF HV/FEE is still under expert control. In case the magnet needs to be ramped/trips, call experts!
Status of ETOF may change, check with outgoing shiftleader and elog!
Groups:
- Printer-friendly version
- Login or register to post comments