STAR Protected
Strange and Multi-Strange Hadron Production in Cu+Cu collisions at 62.4 GeV at RHIC
Updated on Mon, 2008-09-29 09:54 by munhoz. Originally created by bedanga on 2008-09-16 16:55.Reference
Speaker : Marcelo Gameiro Munhoz
Talk time : 14:00, Duration : 00:30
Study of b quark contributions to non-photonic electron yields by azimuthal correlations between non-photonic electrons & hadron
Updated on Sun, 2008-09-28 09:44 by sshingo. Originally created by bedanga on 2008-09-16 16:06.Reference
Speaker : Shingo Sakai
Talk time : 13:30, Duration : 00:30
2008.09.16 QA plots for maximum sided residual (obsolete)
Ilya Selyuzhenkov September 16, 2008
Longitudinal double-spin asymmetries for pi0 production at forward rapidities in pp collisions at root(s)200 GeV at STAR
Updated on Sun, 2008-09-28 17:09 by wissink. Originally created by sowinski on 2008-09-16 12:35.Reference
Speaker : Scott Wissink ( IU )
Talk time : 17:00, Duration : 00:20
System size, energy and centrality dependence of strange hadron elliptic flow at STAR
Updated on Sun, 2008-09-28 12:36 by hmasui. Originally created by ruanlj on 2008-09-12 13:23.Reference
Speaker : Hiroshi Masui
Talk time : 11:00, Duration : 11:30
final checks for di-hadron correlations with respect to reaction plane
Updated on Sat, 2008-09-27 17:07 by pawan. Originally created by ruanlj on 2008-09-11 13:09.Reference
Speaker : Fuqiang Wang
Talk time : 15:30, Duration : 16:00
three particle deta deta correlation paper draft
Updated on Sat, 2008-09-27 17:02 by pawan. Originally created by ruanlj on 2008-09-11 13:07.Reference
Speaker : Pawan Netrakanti
Talk time : 15:00, Duration : 15:30
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
Conference Phone Number: 510 486 7333
Time: 10 - 11 am EDT
* --===================================--*
Agenda:
1) Upgrade Issues - Helen/Zhangbu
2) Activities at WAH - Bill
* --===================================--*
Brief Summary:
* --===================================--*
News and Other Meetings:
1) STAR Reginal Meeting and QGP Meeting, Nov. 24-28, 2008, VECC, Kolkata, India
Contact: Subhasis Chattopadhyay, sub@veccal.ernet.in
2) List of student's thesis topics in STAR
3) QM09 STAR highlight tals (2), parallel talks, individual invited talks
RP detection at low energies using the BBC
Updated on Fri, 2008-09-26 09:09 by ypandit. Originally created by barannik on 2008-09-10 12:41.Reference
Speaker : Yadav Pandit
Talk time : 17:15, Duration : 00:20
2008.09.09 Maximum sided residual with shower shapes sorted by uv- and pre-shower bins
Ilya Selyuzhenkov September 09, 2008
Data sets:
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
Conference Phone Number: 510 486 7333
Time: 10- 11 am EDT
* --===================================--*
Agenda:
1) STAR PWG regrouping report feedback - Nu
2) FGT Upgrade Status and Issues
3) Upgrade Issues - Helen/Zhangbu
* --===================================--*
Brief Summary:
* --===================================--*
News and Other Meetings:
1) STAR Reginal Meeting and QGP Meeting, Nov. 24-28, 2008, VECC, Kolkata, India
Contact: Subhasis Chattopadhyay, sub@veccal.ernet.in
2) List of student's thesis topics in STAR
09 Sep
September 2008 posts
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 00:59
Conference Phone Number: 510 486 7333
Time: 10- 11 am EDT
* --===================================--*
Agenda:
1) STAR PWG regrouping report - Jamie
2) FY09 upgrade calls - Nu
3) AOB
* --===================================--*
Brief Summary:
PWG regrouping: 1) forward the report to PWGC/STAR; 2) talk to relevant people; 3) start to consider co-conveners (charge)
paper preview:
PWG webpage should be kept in good shape:
Upgrade: Helen/ZHangbu will pdate the upgrade webpage and make a draft of the FY09 R&D call
* --===================================--*
News and Other Meetings:
1) In response to DoE's call on better management for upgrade projects at RHIC, we had a meeting last Friday about STAR upgrade issues. Zhangbu, Flemming, Bill, Jamie, Nu were at the meeting. We discussed several issues. One of them is the protocal for proposal. In the future, we decide to take the following path:
Step 1: STAR internal review
Step 2: Advisory board comments/suggestions
Step 3: Spokeperson/Management office
Step 4: Seek comments from STAR Council
Step 5: send to BNL and DoE
2) Last Friday, Aug. 29, we had a meeting regarding to STAR computing plan. Steve, Tom, Hans Georg, Tim, Jerome, Jamie and Nu were at the meeting. We agreed that STAR willl prepare its computing plan by the end of Sept. and LBNL colleagues will use the info to prepare a proposal to DoE for the future STAR computing avtivities at PDSF.
3) QM09 abstract submisson deadline: Dec. 15, 2008
2008.08.27 Gamma-jet candidates detector position for different pre-shower conditions
Ilya Selyuzhenkov August 27, 2008
Data sets:
2008.08.26 Shower shape: more constrains for pre1>4E-3 bin
Ilya Selyuzhenkov August 26, 2008
Data sets:
A_LL Details
Details on the A_LL result and the systematic studies:
The result in numbers:
Bin | <p_T> [GeV]
Neutral Pion Paper: 2005 ALL & <z>Neutral Pion Paper for 2005 data: Final Results. There are two spin plots planned for the paper, one with the 2005 A_LL and one with the <z>. 2008.08.25 di-jets from pp2008 vs pp2006 dataIlya Selyuzhenkov August 25, 2008 Data sets: |