technical

Run 2013 Information

 The list of ehternet connected devices

Note on Survey Alignment of the Roman Pots

Christie's Operations Documents Distribution Page.

Under:

How to operate HV of pp2pp system

1) log into one of the Slow Controls computer (sc.starp.bnl.gov or sc5.starp.bnl.gov) under sysuser (the password is in the red folder in control room)

How to get PV name and alarm limits

 

STAR Electronic Shiftlog (ESL) Administrator Manual

STAR Electronic Shiftlog (ESL) Administration guide

The STAR (ESL) Electronic Shiftlog is written in JSP (Java server pages) and requires a web server that can render JSP content.

2007 R&D

Under:

Results

Under:

.

Simulations

Under:

.

Working Group Meeting Notes and Review reports

Related Meetings and Events

Under:

2006 R&D

STAR Future & Upgrade

Under:
 

STAR's SSH Public Key Management System

Under:

SSH Public Key Management Tool

Overview

The main from end Web interface begins from »

Ralph test area

Under:

This is my first test page.

Shutdown schedule

Under:

FY06

Under:

STAR FY06 Shutdown Schedule


Project Start Date: 6/26/06
Project Finish Date: 10/27/06

STAR Technical Support Group

Under:

On this site you'll be able to:

  • See the latest shutdown schedule for the STAR Detector
  • Search STAR Mechanical Drawings Database and view the actual