- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- BSMD
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- 01 statistical analysis of 2008 HV
- 02 BTOW swaps ver=1.3
- 03 MIP peak analysis (TPC tracks, 2008 pp data)
- 04 relative tower gains based on MIPs (gain correction 1)
- 05 Absolute Calibration from Electrons
- 06 Calculating 2009 HV from Electron Calibrations
- 07 BTOW absolute gains 'ab initio'
- 08 Completed Calibration and Uncertainty
- Run 9 BTOW Calibration
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
07 BTOW absolute gains 'ab initio'
Updated on Mon, 2009-03-30 12:44. Originally created by balewski on 2009-02-24 09:21.
Under:
Summary of intended BTOW HV change, February 24, 2009
Conclusion:
We will NOT change average gain of West BTOW for eta bins[1,18]. For all other eta bins we will aim at the average West Btow marked as red dashed line.
Full presentation is in attachment 1.
Detailed E/P spectra for 40 eta bins are in attachment 2 & 3.
»
- Printer-friendly version
- Login or register to post comments