dongx's blog - Impact of TPC Supersector Mis-alignment on HFT Tracking - November 14., 2014
- Sti Eloss Test After Eloss fix - August 28., 2014
- StiSsd Energy Loss Test with Different SSD Configurations - August 21., 2014
- HFT-TPC Alignment and TPC T0/DV Verification - August 14., 2014
- Sti Geometry Check with SL14g - July 23, 2014 - July 23., 2014
- Low luminosity runs taken on June 7 - June 8., 2014
- PXL Alignment with Low Luminosity Zero Field Data - May 30., 2014
- Sti Geometry Test: Dmetric vs phi with Gene's Sti fix - May 27., 2014
- Sti Test with HFT geometry - closer look at the energy loss to understand the position of the Dmetric band - May 22., 2014
- Simple calculation on the energy loss impact on the pointing position - May 16., 2014
- Sti Geometry Test (List of Results - Dated May 15, 2014) - May 15., 2014
- Sti Geometry Test - May 14., 2014
- HFT Production Summary - Run14 - March 30., 2014
- Sti tracking test - March 28., 2014
- Run14 Pileup Protection Setup for Physics MB Trigger - March 22., 2014
- Run14 - (TPC Track - HFT Hit) Matching Studies - March 12., 2014
- HFT Alignement in Run14 - February 11., 2014
|