- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Sort by:[Date]
BNL-PDSF transfer, Sept. 2009
Updated on Thu, 2009-09-24 18:03. Originally created by andrewar on 2009-09-24 17:31.We updated the transfer proceedure to make use of the OSG automated monitoring tools. Perviously, the transfers ran between stargrid04 and one of the NERSC data transfer nodes.
Charge Sign Ratio for pp500 SL09b production
Previously Jan showed a plot (figure 10) of the charge seperated W yields. The pl
Spin PWG Presentation W Analysis (9/24/2009)
Updated on Thu, 2009-09-24 10:35. Originally created by seelej on 2009-09-23 23:06.FHC pythia mini-bias simulation for Lambda
I use the pythia mini-bias codes to study to look for the lambda decay products energy deposit in FHC with Lambda->n+pi0.
Abstact for Hadron09: Spectroscopy in DPE processes
Updated on Wed, 2009-09-23 09:19. Originally created by jhlee on 2009-09-23 09:14.Run 9 pp500 ETOW QA
Updated on Tue, 2009-09-29 14:33. Originally created by stevens4 on 2009-09-23 08:07.Endcap Tower QA
Gain Study
Current Full Run QA Status
Updated on Fri, 2010-06-11 00:47. Originally created by pagebs on 2009-09-22 15:44.Full Run QA
PPV - Central Membrane Crossing Issue
Updated on Tue, 2009-09-22 15:36. Originally created by rjreed on 2009-09-22 15:13.Problem:
All vertices, regardless of rank, have 0 returned for mu->PrimaryVertices()->nCrossCentralMembrane().
Spin Meeting Sep 24
Spin Meeting Talk
Notes from meeting:
1. Check another transverse fill with the centroid method