Sort by:[Date]

Trigger by trigger study at Run11 for C6 and comparison with Run10 results

 

Run 16 200 GeV Au+Au Hit Errors (June 13th -- July 3rd)

DAQ file used: st_sst_17175043_raw_5500037.daq

Run 16 200 GeV Au+Au Hit Errors (Jan. 4th -- May 15th)

DAQ file used: st_physics_17105042_raw_3500016.daq

OSU collaboration meeting - HFT Summary report

 

OSU

 

Updated FMS LED Curing Wiring

 Here are updated wiring schemes for the FMS LED Curing system, the wires are now routed as much as possible to the exterior of the frame.

Run12 Inclusive Jet A_LL -- summary

 

collaboration meeting in OSU: D0 Tpc analysis and B to D analysis

 

D0 TPC re-Run


2012 - Embedding QA

Partonic pT plot - all events
Embedding QA plots - excluding the fudge factors
EmbeddingQA - with fudge