W stream runQA of P14ig production (period 2 of run13)

Here is a summary of runQA for run13 period 2, p14ig produciton.

Run12 Calibration: Triggering Options

 The "TriggerOptions" slides below show two options for event samples that we could use for calibration. Given this, it was requested that I split the Option 1 plots up by trigger.

SST Sti Geometry

Version 2: 9 tubes

Beam Crossing QA period 2 of run13

The bunch crossing QA have been done for run13 period 2 data.

background-issue-cut_study-SET2-nearCone-Isolation-cut

Choose 286 runs of highghest zdc rate from run 13 period 1 production. Changed nearCone isolation cut and Et/Pt cut in both Barrel and endcap isolation.
nearCone isolation

beam-crossing-QA-period2-P14ig-production

 Total # of runs : 822 

Fill #s : F17479-F17601

muDst_QA_Run2013_P14ig_production

 Total # of runs 822

Fill # s :  F17479- F17601

Day : 129- Day 161

EEMC Cal Run9-11-14-2014

Sanity check of the new IST and SSD geometries

Figure 1 -- LEFT:  Number of GEANT steps taken vs radius, for y2014a in SL14g.  RIGHT:  Number of GEANT steps taken vs radius for y2014a in DEV (11/13/14). 

Mac OSX working K5 config


Under mac OSX 10.10, no luck, DES is disabled by force and aklog will NOT work at least, not until we finish the OpenAFS server upgrade and make