- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- BSMD
- 1) DATA: 2008 BSMD Calibration
- 1) M-C : response of BSMD , single particles (Jan)
- BSMD 2005 energy scale uncertainty
- Definition of absolute BSMD calibration
- Mapping, strip to tower distance
- Run 10 BSMD Calibrations
- Run 9 BSMD Calibration
- 01 Status of BSMDE,P at the end of pp 500 GeV run, April of 2009
- 02 offline QA of BSMD pp 500, ver1 (Willie+Jan)
- 03 correlated, small ADC spikes in BSMD (Jan)
- 2009 BSMD Relative Gains Information
- DELETE - Run 9 BSMD Status Update 3 (4/24)
- DELETE - Run 9 BSMD Status Update 4 (4/27)
- DELETE - Run 9 BSMD Status Update 5 (4/30)
- DELETE - Run 9 BSMD Status Update 6 (5/4)
- Final Run 9 200 GeV BSMD Status
- Final Run 9 500 GeV BSMD Status - Willie Leight
- Final Run 9 BSMD Absolute Calibration
- Run 9 BSMD Status Update 1 (4/19)
- details about known hardware problems
- details of SMD simulator, simu shower zoom-in
- one cluster topology , definition of 'barrel cell'
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- Run 9 BTOW Calibration
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Run 9 BSMD Calibration
Updated on Tue, 2009-03-10 15:14. Originally created by mattheww on 2009-03-10 15:14.
Under:
Parent page for BSMD Run 9 Calibration
»
- Printer-friendly version
- Login or register to post comments