Home

The STAR experiment

  • Blogs
  • Events
  • Help&FAQ
  • Home
  • Polls
  • Sitemap
  • PWG
  • Software & Computing
  • Sub-systems
  • Council
  • General
  • Juniors

Detector Sub-systems

  • BEMC
    • BEMC Detector Operator Manual
    • Calibrations
      • BPRS
        • Run 8 BPRS Calibration
          • 01 DB peds R9069005, 9067013
          • 02 pedestal(capID)
          • 03 tagging desynchronized capID
          • 04 BPRS sees beam background?
          • 05 ---- peds(softID,capID) & status table, ver=2.2, R9067013
          • 06 MIP algo ver 1.1
          • 07 BPRS peds vs. time
          • 08 BPRS ped calculation using average
          • 09 BPRS swaps, IGNORING Rory's finding from 2007, take 1
          • 10 -------- BPRS swaps take2, _AFTER_ applying Rory's swaps
          • 11 BPRS absolute gains from MIP, ver1.0 ( example of towers)
          • 12 MIP gains ver1.0 (all tiles, also BTOW)
          • 13 MIP algo, ver=1.1 (example of towers)
          • 14 ---- MIP gains ver=1.6 , 90% of 4800 tiles ----
          • 15 Broken BPRS channels ver=1.6, based on data from March of 2008
          • 16 correlation of MIP ADC vs. raw slopes
        • Run 9 BPRS Calibration
      • BSMD
      • BTOW - Calibration Procedure
      • Run 12 BTOW Calibration
      • Run 3 BTOW Calibration
      • Run 4 BTOW Calibration
      • Run 5 BTOW Calibration
      • Run 6 BTOW Calibration
      • Run 7 BTOW Calibration
      • Run 8 BTOW Calibration (2008)
      • Run 9 BTOW Calibration
    • Database
    • Hardware
    • Mapping
    • Service Tasks
    • Software
    • Useful Documents
  • EEMC
  • ETOF
  • FCS
  • FGT
  • FPD & FMS & FPS
  • FTPC
  • FTT
  • HLT
  • L3
  • PMD
  • PP2PP
  • RICH
  • Roman Pot Phase II*
  • SSD
  • SVT
  • Slow Controls
  • TPC
  • TRG
  • Trigger Detectors
  • VPD
  • test

User login

Navigation

  • Groups
  • Recent posts
Home » Detector Sub-systems » BEMC » Calibrations » BPRS

Run 8 BPRS Calibration

Updated on Tue, 2009-03-10 14:32. Originally created by mattheww on 2009-03-10 14:32. Under:
  • unknown

Parent for Run 8 BPRS Calibration done mostly by Jan

  • 01 DB peds R9069005, 9067013
  • 02 pedestal(capID)
  • 03 tagging desynchronized capID
  • 04 BPRS sees beam background?
  • 05 ---- peds(softID,capID) & status table, ver=2.2, R9067013
  • 06 MIP algo ver 1.1
  • 07 BPRS peds vs. time
  • 08 BPRS ped calculation using average
  • 09 BPRS swaps, IGNORING Rory's finding from 2007, take 1
  • 10 -------- BPRS swaps take2, _AFTER_ applying Rory's swaps
  • 11 BPRS absolute gains from MIP, ver1.0 ( example of towers)
  • 12 MIP gains ver1.0 (all tiles, also BTOW)
  • 13 MIP algo, ver=1.1 (example of towers)
  • 14 ---- MIP gains ver=1.6 , 90% of 4800 tiles ----
  • 15 Broken BPRS channels ver=1.6, based on data from March of 2008
  • 16 correlation of MIP ADC vs. raw slopes
‹ BPRS up 01 DB peds R9069005, 9067013 ›
»
  • Printer-friendly version
  • Login or register to post comments
Privacy and Security notice webmaster