Software and Computing

Run 9 (pp500 and pp200)

 Run 9:

The old method was used for the following datasets:

Run 5

2005 Beamline Calibration

Information about how this calibration is done, and links to other years, can be found You do not have access to view this node.

Run 6 (pp)

 

Run 4 (pp)

 

Run 2 (200 GeV pp)

Finding primary vertex seeds

What is done to find the seeds

Pass 1

In this pass, the seed finding was done on a per-run basis.

Run 3 (200 GeV dAu and pp)

 

Software and Computing phone meeting

2009-03-11 12:00
2009-03-11 13:00
Etc/GMT-5
Wednesday, 11 March 2009
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00BBC beam background scalers ( 00:20 ) 0 filesGene Van Buren (BNL)
12:20Embedding requests summary, review of te new schedule ( 00:20 ) 1 fileParticia Fachini (BNL)
12:40Review of opened issues ( 00:15 ) 0 filesAll
12:55AOB ( 00:05 ) 0 filesAll (All)

Software and Computing phone meeting

2009-03-04 12:00
2009-03-04 13:00
Etc/GMT-5
Wednesday, 4 March 2009
1-189, HighSpeed conference bridge, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00SVT slow simulator tuning ( 00:20 ) 1 fileStephen Baumgart (Yale)
12:20Embedding requests summary ( 00:15 ) 1 filePatricia Fachini (BNL)
12:35Opened simulation requests, time estimates and schedule ( 00:20 ) 5 filesVictor Perevoztchikov, Lidia Didenko (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

Software and Computing phone meeting

2009-02-18 12:00
2009-02-18 13:00
Etc/GMT-5
Wednesday, 18 February 2009
1-189, HighSpeed conference bridge, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Status of the network reshape ( 00:10 ) 0 filesJerome Lauret (BNL)
12:10ROOT 5.22.00 readiness (and Qt4) ( 00:10 ) 0 filesValeri Fine / Jerome Lauret (BNL)
12:20Data (re)production for early SL08c ( 00:10 ) 0 filesLidia Didenko (BNL)
12:30SSD Slow simulator ( 00:20 ) 1 fileJonathan Bouchet (KSU)
12:50AOB ( 00:20 ) 0 filesAll (All)

Software and Computing phone meeting

2009-02-11 12:00
Etc/GMT-5
Wednesday, 11 February 2009
1-189, HighSpeed conference bridge, at 17:00 (GMT), duration : 00:00
TimeTalkPresenter
12:00Embedding opened requests and priorities ( 00:15 ) 1 fileParticia Fachini (BNL)
12:15Simulation requests, status & readiness ( 00:15 ) 1 fileVictor Perevoztchikov (BNL)
12:30Database monitoring ( 00:15 ) 1 fileDmitry Arkhipkin (JINR)
12:45d+Au data re-production ( 00:10 ) 0 filesAll (All)
12:55AOB ( 00:20 ) 0 filesAll (All)

Software and Computing phone meeting

2009-02-04 12:00
Etc/GMT-5
Wednesday, 4 February 2009
1-189, HighSpeed conference bridge, at 17:00 (GMT), duration : 00:00
TimeTalkPresenter
12:00Summary of the plan for h+/h- in d+Au ( 00:10 ) 0 filesJerome Lauret (BNL)
12:10D0 simulation production, d+Au test sample ( 00:10 ) 0 filesLidia Didenko (BNL)
12:20RICH scalers ( 00:20 ) 1 fileChristopher Powell (LBNL)
12:40Status updates ( 00:15 ) 0 filesAll (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

STAR Grid Activities

2009-01-29 13:00
2009-01-29 14:00
Etc/GMT-4
Thursday, 29 January 2009
1-189 and phone conference, at 18:00 (GMT), duration : 01:00
Site reports:
	-BNL
	-PDSF
	-WSU

EC2 / Virtualization status

KISTI/networking news
	-Network reshape status

OSG News and meeting reports


Phone / bridge information:
In the US, call 1-605-475-8500

Enter Conference Room Number : 5343115
Skype +99008275343115


-Wayne Betts

 

200901

Topics included

2008 TOF Software review

2008-11-10 00:00
2008-11-10 18:00
Etc/GMT-5
Monday, 10 November 2008
2-78 / 510, at 05:00 (GMT), duration : 18:00

The review will take place on November the 10th and will be held in room 2-78 in Building 510 (Physics). For EVO booking - click here (short summary follows, EVO booking information (ICS, TXT)):

Title:        TOF Software review
Description:	2008 review of the STAR/TOF sub-system project.
Community:	STAR

Eastern Standard Time (-0500)
	Start	2008-11-10  09:00
	End  	2008-11-10  18:00

 

TimeTalkPresenter
09:00Closed session ( 00:10 ) 0 filesReview commitee (All)
09:10Introduction & TOF Event Structure ( 00:50 ) 1 fileXin Dong (LBNL)
10:00Online monitoring and Offline Reader ( 00:30 ) 1 fileJing Liu (Rice)
10:30Break ( 00:15 ) 0 files---
10:45Offline QA and calibration production chain ( 00:30 ) 0 filesXin Dong (LBNL)
11:15Offline calibration ( 01:00 ) 2 filesJing Liu / Zebo Tang (Rice / USTC)
12:15Lunch ( 01:45 ) 0 files---
14:00Physics production chain ( 00:30 ) 0 filesXin Dong (LBNL)
14:30TOF Geometry ( 00:30 ) 1 fileBill Llope (Rice)
15:00Simulation/embedding chain ( 00:30 ) 1 fileDylan Thein (UTA)
15:30Break ( 00:15 ) 0 files---
15:45PID strategy ( 00:20 ) 1 fileMasayuki Wada (UTA)
16:05DB tables ( 00:30 ) 0 filesXin Dong (LBNL)
16:35Offline analysis tools ( 00:20 ) 0 filesXin Dong (LBNL)
16:55VPD vertexing ( 00:20 ) 1 fileXiaoping Zhang (LBNL)
17:15Q&A ( 00:15 ) 0 files---
17:30Closed Committe Meeting ( 00:30 ) 0 files---

TPC performance

 Documentation on performance of the TPC
 

Software and Computing phone meeting

2008-07-16 12:00
2008-07-16 13:00
Etc/GMT-5
Wednesday, 16 July 2008
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Overview of simulation opened requests ( 00:15 ) 0 filesVictor Perevoztchikov (BNL)
12:15SSD opened issues ( 00:20 ) 1 fileJonathan Bouchet (KSU)
12:35Database synchronization, problem, path forward ( 00:15 ) 1 fileMicheal DePhillips (BNL)
12:50Summary of production readiness ( 00:10 ) 0 filesAll (All)

Run 8 (200 GeV dAu and pp)

NetLogger framework

UCM status overview

The URL for the demo portal is http://grid.txcorp.com:8080/gridsphere/.

 

Speaker : David Alexander ( Tech-X )


Talk time : 13:00, Duration : 00:30

Parallel Session - STAR S&C, UCM and CEDPS joint meeting

TimeTalkPresenter
13:00UCM status overview ( 00:30 ) 1 fileDavid Alexander (Tech-X)
13:30NetLogger framework ( 00:30 ) 1 fileDan Gunter (LBNL)