management

STAR run25 BUR

Under:

  

BUR Documents  for Run25

STAR run24-25 BUR- backup

Under:



Background Materials

STAR run24-25 BUR

Under:

  

BUR Documents (2023 May) for Run24-25

STAR run23-25 BUR

Under:

Background Materials

STAR run22-25 BUR

Under:

  Background Materials

Subcommittee on STAR in Runs 23-25

Under:

STAR in sPHENIX Era (Runs 23-25) :: BUR subcommittee


Run-23/25 AuAu200 Heavy-Ion running

STAR run21-25 BUR

Under:
 

Background Materials

Nominated Speakers 2019-2024

Under:
Conference Date Abstracts due

Nominated speakers 2016-2018

Under:


STAR run20-21 BUR

Under:

 STAR Beam Use Request for Runs 20 and 21

 

Restricted Access

THis group was created to provide a way to protect posts (pages, blogs, images, ...) from generla access

STAR run19-20 BUR

Under:

 STAR Beam Use Request for Runs 19 and 20

 

Summary Tables

Under:

 Summary Tables 

for run 18 

STAR run18-19 BUR

Under:

STAR run16-17 BUR

CAD luminosity projection: 

2016-08-18

 

PAC talks

Under:

 PAC talks: 

1) run14/15 experimental results and status (Frank) 

2) BUR (Zhangbu)

3) BES-II and iTPC upgrade (Helen+Flemming)

computing and calibration

Under:

 Producing the requested data for physics will involve significant use of data stores, considerable processing time, and time sp

HFT preliminary results and projection

Under:

2016/05/10 v3: text updated 

MTD section 2.5: Progress on results and status with the MTD

Under:

on May 24, add one para in Section 4.8 for MTD in run17.

Update on May 16th:
seperate run 16 performance and projection from section 2.5.

on May 6.

run18 (maybe 17 or later) 27GeV for Lambda/Lambdabar Global Polarization

Under:

 proposal and projection for 2 weeks of 27GeV Au+Au