2007 run, hardware changes
Updated on Thu, 2007-04-12 12:33. Originally created by balewski on 2007-04-04 16:02.
Under:
April 4, 5 pm, no beam:
We would like ETOW tcd phase set from 12->19 and EMSD from 55->65 , Jeff implemented it
Will's new table (to be implemented)
Towers
TCD box dec box hex
1. 19 18 0x12
2. 19 8 0x8
3. 19 86 0x56
4. 19 80 0x50
5. 19 43 0x2B
6. 19 31 0x1f
For EEMC MAPMT -- rather than change all 48 box configs we could
start out by just adding 10 ns to the phase: 55 -> 65.
new Tower config files in /home/online/mini/tcl/ you'll have to change symbolic links tower-1-current_beam_config.dat -> 03.01.07/tower-1-current_beam_config.dat
Jim: after 8094053 should have the new tcd phase and box configuration
----
The night shift took a 300k calibration run with the ETOW and ESMD Run 8095061
----
There is a shift log entry as to the run numbers and conditions.
I shifted only the tcd phase and used the new FEE configs installed
yesterday. This should show fall off by ~10-20% on each side in towers
and flat in MAPMTs.
run ETOW tcd ESMD tcd
8095096 19 65 30k std config, for 1st daq file ETWO head=off
8095097 1 55 30k
8095098 7 60 30k
8095099 13 60 30k
8095100 25 70 30k
8095101 31 75 30k
8095102 19 65 100k std config
8095103 19 65 0k std config died
8095104 19 65 28k std config
------ April 12----
I've made these changes in 2007Production2, 2006ProductionMinBias &
2007EMC_background
a. UPC ps --> 3
b. bht1 thresh --> 16
c. raised all triggers to production
d. changed all triggers based on zdc to different production ids
-Jeff
»