- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- 2007 run, hardware changes
- 2008 run preparation
- Calibrations
- EEMC Detector Operator Manual
- EEMC Maintenance/Operations Documents
- Endcap Geometry
- Endcap Geometry update (2009)
- Log of tower base and fee issues
- eemc as-built info and proto tests
- emc2-hn minutes (by Jan)
- how-to by Jan
- slow controls archive viewer
- trash
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Log of tower base and fee issues
Updated on Tue, 2009-12-22 12:24. Originally created by sowinski on 2009-12-22 12:24.
Under:
Attached is a text file of tower base and other issues. I went back through the electronic shift log and recorded all the bases that had been replaced and recording of other fixes and problems. The status as of the begin of the run 10 is also stated.
Jim
»