eTOF software status
This page tries to summarize the status of the eTOF software.
Done:
- integration of data storage classes into StEvent (StETofDigi, StETofHit, StETofHeader, StETofCollection)
- StETofDigiMaker reads in .daq files and stores the digi inforamtion into StEvent
Under review:
- StETofCalibMaker, StETofHitMaker, StETofMatchMaker
- StEtofPidTraits
- data storage classes in MuDsts
- simple version of StETofSimMaker
- data storage clases in PicoDsts
Under development:
- StETofPidMaker (?) that decides which start time is used for the time-of-flight measurement, also calculates eTOF start time from matched tracks in 2019/20
- database tables for calibrations & electronic id to geometry mapping + changes in the makers to fetch the relevant values from the database
Needs update for next year:
- event builder update on CBM side to scale from one sector to the full wheel of eTOF modules
- online monitoring code needs to be adapted to cover all 12 sectors
- offline monitoring via StETofQAMaker (?)
Some milestones:
Feburary 22nd-24th 2018: start of software development during eTOF workshop at Rice University
March 24th 2018: first isobar data with eTOF information in the daq files (trigger window set)
April 25th 2018: online monitoring Jevp plots finished for data taking in 2018; mapping from electronic channels to geometry understood
April 28th 2018: noise rate monitoring via etofDaqDoer available
May 12th 2018: StETofDigiMaker and StEvent data classes ready for software peer review
June 5th 2018: firmware fix to properly save the reset time of the bTOF clock into the eTOF data
July 25th 2018: first patch of eTOF reconstruction software was included in the STAR CVS repository and is part of software library version SL18f
August 1st 2018: eTOF software included in production of calibration sample for Au+Au data at sqrt(sNN)=27GeV
August 23rd 2018: first 1/beta vs. momentum plot for simulation with full eTOF wheel
September 6th 2018: first 1/beta vs. momentum plot for data
September 29th 2018: eTOF PID plots with improved slewing corrections; overlapping strip analysis shows 100ps time resolution in all modules;
some more details of the calibration procedure
December 6th 2018: first look to data taken with the full eTOF wheel during commissioning on November 23rd
----------------------------------------------
status presentations:
July 20th 2018, collaboration meeting at Lehigh University: slides
September 6th 2018, eTOF meeting: slides
October 17th 2018, S&C meeting: slides
November 21th 2018, S&C meeting: slides
December 11th/12th 2018, winter analysis meeting at BNL: calibration status, general software status