- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Sort by:[Date]
Residuals in Run 20 FXT
Updated on Thu, 2024-04-11 15:12. Originally created by genevb on 2024-04-11 14:18. I found a single DAQ file from Run 20 FXT already on disk and used it to generate TPC residuals via StiPulls using the commands listed further down this page.
energy dependence of pT correlators 3
Updated on Wed, 2024-04-10 16:32. Originally created by rutikmani on 2024-04-10 16:32.
Proton Purity Results at FXT Energies - Part 2
Updated on Tue, 2024-04-09 21:55. Originally created by cracz on 2024-04-09 21:34.Vped scan vol 1 2024
Updated on Wed, 2024-04-10 19:47. Originally created by mstefaniak on 2024-04-09 16:27.I ran the vped scan with local clock:
based on https://drupal.star.bnl.gov/STAR/blog/mstefaniak/Vped-test-05052023
Collaboration Meeting Talk: Update and Planning
Updated on Tue, 2024-04-09 12:48. Originally created by bschaefer on 2024-04-09 12:48.
Changed channels and 7 Pattern final? (vol1)
Updated on Mon, 2024-04-08 22:25. Originally created by mstefaniak on 2024-04-05 16:58.Summary:
We have 4 dead guys: W PP6TT1, E PP9TT15, W PP2TT10, E PP1TT31
Temperatures and dark currents in the EPD
Updated on Tue, 2025-03-25 21:21. Originally created by lisa on 2024-04-05 11:07. Executive summary: There is a significant correlation between higher SiPM dark currents in groups of tiles, and the temperature readings on the corresponding FEEs. The tem
FST Meeting on 04/08/2024
Updated on Mon, 2024-04-08 11:51. Originally created by sunxuhit on 2024-04-05 00:33.Start: 2024-04-08 11:00 am
Timezone: America/New York
Meeting Agenda:
1. Xu Sun: FST NIM Status
Beginning of the run 2024: temperature and 7 pttern tests
Updated on Fri, 2024-04-05 11:24. Originally created by mstefaniak on 2024-04-04 20:11.Summary:
a) Temperature: dark current probably does not generate that much heat. Reason for change from 18-28 not known.
b) 7Pattern test:
Beginning of the run 2024: temperature and 7 pttern tests
Updated on Thu, 2024-04-04 20:06. Originally created by mstefaniak on 2024-04-04 20:06.1. We installed West and then East EPD
2. Attached the fibre cables
3. Tight lighting test done