Sort by:[Date]

COVERITY checker description

from here (a bit old but still relevant)

d+Au 20 GeV analysis

Fastoffline stuff.

GPC discussion

Run 16 EMC dAu 19.6 GeV Timing Scans

update: jump to #17149044 below ->

Off-line analysis of cal_scan #17149031:

The averaged east-west BTOW setting is 122ns (note:

J/Psi mass from toy simulation

Reconstructed J/Psi mass peak from electron-positron pairs in the FMS

PYTHIA subprocesses:

  • 86 g+g->J/Psi+g

underlying event summary

 

Jet Mini Workshop, May 27th, 2016 Underlying Event Studies pp@200GeV

 

HF PWG Meeting Minutes by Zhenyu - 2016/05/26

0) Data production priority:

RHIC-AGS users meeting 2016

Postshower design

Postshower with two halves and top trapezoidal section.
The edges are projected from the shower max position in the center of the inner- and outermost towers in the FMS.