Upgrades

F2 g1 figures

Section VI: Collaboration Evolution

cost and schedule (what goes into Table 6.1):

Section V: R&D Projects

https://drupal.star.bnl.gov/STAR/system/files/eSTAR_RD_v0.pdf
https://drupal.star.bnl.gov/STAR/system/files/eSTAR_RD_v1.pdf

R&D projects:

Section IV: Simulations

https://drupal.star.bnl.gov/STAR/system/files/eSTAR-LoI_draft_v4_rhf.docx

Latest version from Renee and Ming
 

Section III: Detector Configuration and Components

First version: 08/27 3AM
https://drupal.star.bnl.gov/STAR/system/files/Detector_Configuration_Components_v0.pdf

i) current detector layout

Section II: Physics Highlights from EIC whitepaper and eSTAR Performance

Section I: Introduction

update version:

eSTAR LoI Draft

Under:

eSTAR LoI v31 a few clean-up, 10/05/2013

eSTAR LoI Draft

eSTAR LoI Draft

Operations

Welcome to the STAR Operations Home Page

2012 R&D and Upgrades

Under:

 STAR called for R&D for FY13 in early September. The proposals received are given here.

eSTAR Biweekly Phone meeting Agenda, Talks and Minutes

GMT

eSTAR Task Force

Under:

eSTAR Letter of Intent:
Draft: https://drupal.star.bnl.gov/STAR/node/27990

Publications

Under:

MTD publications

2008 (FY09) R&D

FY09 R&D requests:

07 Document for Charge Sharing 2D_Readout module / Miro

Under:

In this document one can find GERBER files for Charge Sharing 2D_Readout module. This module will be used for test and study charge sharing effect in GEM detectors.

Deleted Documents

Under:

Deleted documents.

Physics projection from HFT simulation (D0 RAA and D0 elliptic flow vs pT)

Under:

D0 RAA