Upgrades

FST Forward Tracking Simulation Studies

Under:

This page contains simulation studies regarding the Forward Silicon Tracker (FST).

FCS DB

Under:

Offline Database, Geometry for FCS

  • fcsDetectorPosition.idl (1 row) : Detector Position for each [det=0~3]
    struct fcsDetectorPosition {

FCS

Under:

Forward Calorimeter System

Start-of-run EPD tasks and instructions

Under:
 At the beginning of every run, there are a number of things that need to be done for the EPD.

EPD Run by Run QA 2018

Under:

iTPC closeout review May 2, 2019

Final report and experts from the review were received on August 1, 2019
The three documents have been attached 

EPD Timing Scan 2019

Under:

Nominal Values for 2018 were
B Gate End = 48
B Gate Start = 32
C Gate End = 39
C Gate Start = 23
TAC Stop = 64

Post-installation / pre-beam commissioning 2019

Under:

1. Verify proper mapping from TUFF to StEvent (tests databases, cabling...)  ("Seven Patterns" test) - DONE

October 2018 DOE NP review

 Review was held at BNL

Here are the final reports

Known issues and problems

Under:
[On this page, red, bold text indicates action needed.]
»

Article 21 SN0010

 

Article 20 SN0014

 Docs from LBL assembly

FEE, SiPM, RX board Health Status

Under:

USTC has done a fantastic job of collecting and systematically posting their QA and characterization tests here.  They cover

iTPC run18 progress

 The page will contain material presented at the itpc software meetings,
or circulated with the group. Material will be in reverse order

Forward Upgrade NSFC Silicon Tracker Proposal 2018

Under:

96

SN0018 (Article 24)

 

Clear Fiber Bundle Health/Status

Under:
A summary of all of the testing results of the Clear Fiber bundles since the start.

Electronics Production Readiness Review

 An iTPC production readiness review was held on January 22, 2018

The agenda was:

Article 22 SN0017

 

Article 21 SN0010