Upgrades
Operations 2024
Updated on Mon, 2024-10-07 13:36 by mstefaniak. Originally created by lisa on 2024-04-15 17:27. Under:FST Forward Tracking Simulation Studies
Updated on Tue, 2021-05-25 17:58. Originally created by gwilks3 on 2021-01-28 18:00. Under:This page contains simulation studies regarding the Forward Silicon Tracker (FST).
FCS DB
Updated on Mon, 2024-03-11 11:25. Originally created by akio on 2021-01-22 19:51. Under:Offline Database, Geometry for FCS
- fcsDetectorPosition.idl (1 row) : Detector Position for each [det=0~3]
struct fcsDetectorPosition {
FCS
Updated on Fri, 2021-01-22 19:49. Originally created by akio on 2021-01-22 19:49. Under:Forward Calorimeter System
Start-of-run EPD tasks and instructions
Updated on Thu, 2020-06-11 18:41. Originally created by adams92 on 2019-12-17 22:16. Under:EPD Run by Run QA 2018
Updated on Tue, 2019-05-28 09:44. Originally created by rjreed on 2019-05-28 09:44. Under:Isobar run by run QA: drupal.star.bnl.gov/STAR/blog/jewigleb/epd-isobar-2018-run-list
iTPC closeout review May 2, 2019
Final report and experts from the review were received on August 1, 2019
The three documents have been attached
EPD Timing Scan 2019
Updated on Sat, 2019-02-23 10:50. Originally created by rjreed on 2019-02-23 10:50. Under:Nominal Values for 2018 were
B Gate End = 48
B Gate Start = 32
C Gate End = 39
C Gate Start = 23
TAC Stop = 64
Post-installation / pre-beam commissioning 2019
Updated on Fri, 2019-02-08 01:32. Originally created by rjreed on 2019-02-08 00:31. Under:1. Verify proper mapping from TUFF to StEvent (tests databases, cabling...) ("Seven Patterns" test) - DONE
October 2018 DOE NP review
Review was held at BNL
Here are the final reports
Known issues and problems
Updated on Mon, 2020-01-13 15:56 by adams92. Originally created by lisa on 2019-01-27 05:44. Under:Article 20 SN0014
Docs from LBL assembly
FEE, SiPM, RX board Health Status
Updated on Mon, 2018-04-02 04:50. Originally created by lisa on 2018-04-02 04:50. Under:USTC has done a fantastic job of collecting and systematically posting their QA and characterization tests here. They cover
iTPC run18 progress
The page will contain material presented at the itpc software meetings,
or circulated with the group. Material will be in reverse order
Forward Upgrade NSFC Silicon Tracker Proposal 2018
Updated on Tue, 2018-03-13 17:31 by qhxu. Originally created by xzb on 2018-02-08 09:15. Under:96
Clear Fiber Bundle Health/Status
Updated on Thu, 2018-01-25 14:51. Originally created by ewigleben on 2018-01-24 10:32. Under:Electronics Production Readiness Review
An iTPC production readiness review was held on January 22, 2018
The agenda was: