FGT Analysis online QA : Pedestal shift of 4AB

quadrant 4AB showing pedestal shift since run # 14085034.

FGT Analysis : HV ramp profile

 

Attached are the profiles for  Measured and Demanded HV uX for ramping down  at
15.30 and 20.40 and HV measured for ramping up  on 03/26/13.
&nbs

Measured1

Measured1

Run 13 W analysis : Understanding the W reconstruction code

Access MuDsts 
Code :  St2011W_accessMuDst.cxx [
  • devika's blog
  • Read more
  • HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    HVMeasured_uX_ramping_down

    BEMC transverse energy as function of centrality

    UPC publication plan March 2013

    2006 EEMC Neutral Pions: Updated Systematics

    Updated Systematics and Methodology

    After an overhaul of my asymmetry calculation and systematics I post new money plots. I summarize the changes as the following:

    Run-11 Transverse Jets: Thoughts on an Embedding Request

    The Run-11 p+p 500 GeV transverse jet analysis has progressed to the point that it is time to discuss what will be needed for an embedding request.

    FGT trigger rate and dead time with 8 time bins and new triggers

    The current pp500_production_2013 trigger config file use the following trigger to include FGT,
     JP0*DiJet

    Talks on Run12 Pi0

     I have attached a proposed plan for my DIS talk based on what I showed at the collaboration meeting.

    Chisq per d.f. for a few A_N points

    A spreadsheet with calculations of the chisq / d.f. and associated probability for the A_N results of J.

    Trigger rate / FGT - March 25, 2013 - Run # 14084005

     

    Trigger Board Run13

    2013-03-25 11:30
    America/New York
    Monday, 25 March 2013
    BNL, at 15:30 (GMT), duration : 00:00
    2013 Mar 25 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100) Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18

    HV ramp profile - March 24, 2013 - Module 0

     
    Module 0 - Measured:

    HV ramp profile - March 23, 2013 - Module 0

     
    Measured: Module 0

    AOB : database for SSD wafers tests

    Speaker : jonathan, Jim Thomas


    Talk time : 14:10, Duration : 00:01

    These slides show the database that was creating during the SSD wafers tests.
    It keep track of the parameters of all the sensors tested.