FCS jet Energy/pT resolutions --update

I have re-calibrated ECAL and HCAL in simulation using the "alpha_{0}"  intercalibration method.

ZDC (simple, i.e. RICH/RHIC) scalers in Run 2013

In Run 2013, we have changed the ZDC electronics to remove much of the NIM functionality and replace it with a custom-built, and hopefully more robust, and remotely programmable module.&nbsp

First look at BeamLine in Run 13 pp510

 I processed a few thousand events from run 14072098 with the chain:

software update

Speaker : Jonathan/Mike


Talk time : 13:30, Duration : 00:20

 some news :
1) Thomas Ullrich changed some parts of StEventUtilities and StPxlHit for tracking with PXL hits

FGT set 14 and set 15 comparison

Fig 1, disk 1 and disk 2

Checking FMS Jets With/without time dependent gain corrections

Pad 1-4 are without time-dependent gain corrections and each one is for some specific
way of QT matrix generation from MuDst. One of them would be correct for defining QT-matrix.

FGT hardware status - Run 13 beginning

Stv and Sti treatement of dEdx and MCS

1) Sti and Stv appear to use the same energy loss functions, gdrelx and gfluct, obtained from G3.  There is a difference in the way Sti and Stv call gfluct (which is renamed gsigma2

2006 EEMC Neutral Pions: Update to Spin-PWG (March 14, 2013)

During the spin meeting it was suggested I post some supporting plots to aide in the consideration of preliminary approval for the latest AN results.

A proposal to change the VFS apv parameter

The plot that follows is a summary of the change in the average rise time of the pulses seen during the VFS parameter scan.

Ke3 in Au+Au 39 GeV embedding QA

 

Ke3 in Au+Au 62 GeV embedding QA

 

FGT HV gain with new cuts

FGT SW meeting

2013-03-13 12:30
2013-03-13 13:30
America/New York
Wednesday, 13 March 2013
Evo phone ID 14 8465, pwd: 2589, at 16:30 (GMT), duration : 01:00

AOB

Speaker : All ( All )


Talk time : 12:35, Duration : 00:15

Run 12 p+p 500 GeV SC and GL updates

Speaker : Gene V. Buren ( BNL )


Talk time : 12:15, Duration : 00:20
 

News from the Run

Speaker : L. Eun ( LBNL )


Talk time : 12:00, Duration : 00:15

Software and Computing Meeting

2013-03-13 12:00
2013-03-13 13:00
America/New York
Wednesday, 13 March 2013
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00News from the Run ( 00:15 ) 0 filesL. Eun (LBNL)
12:15Run 12 p+p 500 GeV SC and GL updates ( 00:20 ) 1 fileGene V. Buren (BNL)
12:35AOB ( 00:15 ) 0 filesAll (All)

FMS Timing

Runs 14071212-1407128 FMS timing data
Run Config = shift_standard_mar12
Tier1 = chris_130312d.dict
BBC trigger ~300 Hz  10K events

FMS Timing

Runs 14071212-1407128 FMS timing data

Run  QT GateStart/Stop
12  10/15
13  20/25...
16  50/55
17  70/75...