unknown
New Requests
Updated on Tue, 2008-08-26 10:25. Originally created by starembed on 2008-08-26 10:25. Under:In the near future we hope to have a dedicated drupal module available for entering embedding (and simulation) requests.
Current Requests
Updated on Fri, 2010-02-19 08:50. Originally created by starembed on 2008-08-22 10:25. Under:Current Requests were either submitted using the cgi web interface before it had to be removed (September 2007) or via email to the embedding-hn hypernews list.
Operations (OBSOLETE)
Updated on Sat, 2018-06-23 09:05 by zhux. Originally created by starembed on 2008-08-22 10:16. Under:The full list of STAR embedding requests (Since August, 2010):
http://drupal.star.bnl.gov/STAR/starsimrequest
01 statistical analysis of 2008 HV
Updated on Wed, 2008-08-20 08:02. Originally created by balewski on 2008-08-19 16:54. Under:Goal: study eta dependence of 2008 BTOW HV
Fig 1 Eta-phi distribution of HV
Run 8 BTOW Calibration (2008)
Updated on Fri, 2009-06-05 11:38 by mattheww. Originally created by balewski on 2008-08-19 15:36. Under:2008 BTOW calibrations
- BTOW HV used in 2008 are in the file »
20 BSMD saturation
Updated on Sat, 2008-08-16 20:33. Originally created by balewski on 2008-08-16 20:23. Under:The isolated BSMD cluster algo allows to select different range of tower energy cluster as shown in Fig.1
general routing for the top and bottom GEM, August 16,
Updated on Sat, 2008-08-16 19:46. Originally created by balewski on 2008-08-16 19:46. Under:these Gerber files show the general routing for the top and bottom GEM foil layers plus a representative sample of the GE
Data Sets
For the cross section analysis I am using a number of Monte Carlo samples along with one data set. The details of each of these sets can be found below:
Cross Section Analysis
On the pages listed below I'm going to try to keep track of the work towards measuring the cross section for inclusive pion production in pp collisions from run 6. I'll try to keep the posts
Deactivating records
A full description of the deactivation feild can be found here
http://drupal.star.bnl.gov/STAR/comp/db/time-stamps
2008.08.14 Shower shape with bug fixed dd-library
Ilya Selyuzhenkov August 14, 2008
Data sets:
19) Absolute BSMD Calibration, table ver2.0, Isolated Gamma Algo description
Updated on Mon, 2009-06-15 11:14. Originally created by balewski on 2008-08-14 15:31. Under:BSMD calibration algo has been developed based on M-C response of BSMD & towers to single gammas.
Executive summary
Working Group Members
Plots Jan
Updated on Wed, 2008-09-03 06:54 by testadmin. Originally created by balewski on 2008-08-13 16:57. Under:plots
Locations of Akio's pages in protected/spin
Updated on Wed, 2008-09-03 06:53 by testadmin. Originally created by akio on 2008-08-13 11:27. Under:August 13, 3 runs produced with PPV w/o using CTB
dAu200 (2008)
Updated on Tue, 2009-01-20 10:58. Originally created by genevb on 2008-08-12 18:20. Under:Some studies were done initially to get a good guess at the SpaceCharge in dAu.
Detailed event comparison PPV & VPD vertex, (Rosi)
Updated on Wed, 2008-09-03 06:53 by testadmin. Originally created by balewski on 2008-08-12 15:57. Under:BFC