Run 9 commissioning plan
Run 9 500 GeV Commission plan (start of draft) Not necessarily time ordered
or prioritized
Establish collisions
04 relative tower gains based on MIPs (gain correction 1)
Updated on Wed, 2009-02-18 11:32. Originally created by balewski on 2009-02-17 22:21. Under:Determination of relative gains BTOW gains based on MIP peak for the purpose of balancing HV for 2009 run
Procedure:
QA plots Rho (February 16 2009)
Updated on Tue, 2009-02-24 14:09. Originally created by starembed on 2009-02-16 15:46. Under:QA P06ib (Rho->pi+pi)
Spin PWG meeting (2/12/09)
The PDF for my slides is linked below.
h) W-algo BTOW
Updated on Wed, 2009-08-26 13:42. Originally created by balewski on 2009-02-12 00:22. Under:L2 W-algo for BTOW, p+p 500 GeV , 2009 run
P08id (phi ->KK)
Updated on Wed, 2009-02-11 14:52. Originally created by starembed on 2009-02-09 18:51. Under:QA P08id (Phi->KK)
convert L2 bin histo to root histo
Updated on Sun, 2009-02-01 23:54. Originally created by balewski on 2009-02-01 23:54. Under:Compile this stand alone code
$STAR/StRoot/StTriggerUtilities/L2Emulator/macros/binH2rootH.c
It needs L2Histo.cxx L2Histo.h from
BEMC Calibration Uncertainty
Goal:
To calculate the systematic uncertainty on the cross section due to the BEMC calibration uncertainty.
Justification:
Definition of absolute BSMD calibration
Updated on Mon, 2009-01-26 13:01. Originally created by balewski on 2009-01-25 13:17. Under:NOT FINISHED
Definitions of quantities used for empirical calibration of BSMD.
Revised January, 26, 2009
HOW-TO: create a new Run RunLog browser instance and retire previous RunLog
Updated on Mon, 2009-11-09 08:53. Originally created by testadmin on 2009-01-15 15:36. Under:1. New RunLog browser:
HOW-TO: compile RunLogDb daemon
- Login to root@onldb.starp.bnl.gov
- Copy latest "/online/production/database/Run_[N]/" directory contents to "/online/production/database/Run_[N+1]/"
- Grep eve
How-To Online DB Run Preparation
This page contains basic steps only, please see subpages for details on Run preparations!
High-Level Online Trigger (HLT)
Updated on Tue, 2008-12-30 10:06. Originally created by xzb on 2008-12-30 09:59. Under:Online QA Rate Limitations
Updated on Fri, 2009-01-09 15:54. Originally created by genevb on 2008-12-18 15:29. Under:Some interest has been expressed to obtain increased statistics for at least some quantities shown in the Online QA plots.
5) Evaluation of BSMD dynamic range needed for the W program at STAR, ver 1.0
Updated on Mon, 2008-12-08 13:01. Originally created by balewski on 2008-12-06 22:00. Under:M-C study of BSMD response to high energy electrons
16 correlation of MIP ADC vs. raw slopes
Updated on Tue, 2009-03-10 14:47. Originally created by mattheww on 2008-11-24 17:12. Under:Scott asked for crate based comparison of MIP peak position vs. raw slopes .
I selected 100 consecutive BPRS tiles, in 2 groups, from each of the 4 crates.
Replication monitoring
Updated on Mon, 2009-05-11 07:48 by testadmin. Originally created by dmitry on 2008-11-24 03:01. Under:Following tools are available for replication check:
Server list and various parameters
Here will be a server list (only those servers participating in various replication scenarios)
15 Broken BPRS channels ver=1.6, based on data from March of 2008
Updated on Tue, 2009-03-10 14:47. Originally created by mattheww on 2008-11-23 13:01. Under:The following BPRS pmts/tiles have been found broken or partially not functioning, based on reco MIP response from pp 2008 data.