- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- BSMD
- 1) DATA: 2008 BSMD Calibration
- 1) M-C : response of BSMD , single particles (Jan)
- BSMD 2005 energy scale uncertainty
- Definition of absolute BSMD calibration
- Mapping, strip to tower distance
- Run 10 BSMD Calibrations
- Run 9 BSMD Calibration
- details about known hardware problems
- details of SMD simulator, simu shower zoom-in
- one cluster topology , definition of 'barrel cell'
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- Run 9 BTOW Calibration
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Mapping, strip to tower distance
Updated on Fri, 2008-08-01 08:26. Originally created by balewski on 2008-07-30 15:26.
Under:
For every strip we find the closest tower and determine the distance between tower center and strip center.
Both plots show strip ID on the X-axis, and tower ID on the Y-axis. Error in Y is distance between centers in CM.
It is not true 15 eta strips covers every 2 towers! It is only approximate since strip pitch is constant bimodal and tower width changes continuously.
There is still small problem, namely strip Z is calculated at R_smd and tower Z is calculated at the entrance of the tower
leading to clear paralax error - we are working on this.
Fig 1.
Top plots is for SMDE for module 1. Note E-strip always spans 2 towers and we used tower IDs in one module.
Bottom plots shows phi strips for module 1.
Fig 2.
Top plots is for SMDE for modules 1-4.
Bottom plots shows phi strips for modules 1-4.
»
- Printer-friendly version
- Login or register to post comments